Skip to main content

Sleipner’s highlights system for moving excavators

Sleipner will explain the principle behind its “revolutionary method to improve the overall productivity in open-pit mines, quarries and construction sites.” The improvement is based on moving excavators around the site much faster than before, and additionally the Sleipner method saves time and money and considerably increases the excavators’ life, says the company.
February 13, 2013 Read time: 2 mins
Lafarge Aggregates’ Whitwell Quarry, UK, acquired a Sleipner in 2012. It is used to move a Volvo EC700 excavator
7155 Sleipner will explain the principle behind its “revolutionary method to improve the overall productivity in open-pit mines, quarries and construction sites.”

The improvement is based on moving excavators around the site much faster than before, and additionally the Sleipner method saves time and money and considerably increases the excavators’ life, says the company.
With Sleipner, it is possible to move machines up to the weight of 550tonnes.

Sleipner says its system is essentially a dolly system, consisting of large wheels, and ramps with axles. One end of the excavator tracks is driven on the ramps so that the tracks are lifted off the ground. Then the excavator turns around, places the boom on the bed of a dump truck and lifts the other end of tracks by the hydraulic force of the boom. As the whole excavator is now above the ground, it is easily transported by the truck to the desired location on site.

“The whole transporting process is carried out in a fraction of time compared to walking the same distance on tracks,” says Sleipner.

“The Sleipner method will reduce the transportation time up to 80%, which increases the efficiency and productivity of the excavator. The system considerably reduces the wear factor to the whole machine but in particular, to tracks and undercarriage. With Sleipner, the lifetime of the undercarriage is doubled or even tripled.” It is also said to make maintenance and service easier, faster and more cost-efficient, because the machine can be moved to the workshop instead of organising the service under the open sky.”
The system can be modified to fit all excavator brands and models from 20-550tonnes.

Stand: B3.112

%$Linker: 2 Asset <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 52005 0 oLinkExternal www.sleipner.fi www.sleipner.fi false /EasySiteWeb/GatewayLink.aspx?alId=52005 false false%>

 

%$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 11560 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/bauma-2013/video/ true false%>

For more information on companies in this article

Related Content

  • Haver & Boecker is adding to its screen range with wire and polyurethane screen decks
    February 8, 2013
    Haver & Boecker is expanding its screen range with the addition of the Ty-Wire hybrid screen deck and of ultrasound screen decks. Ty-Wire hybrid screens use wire that is covered in polyurethane, providing a greater open area than a standard PU screen but with a lifetime that can be 4-6 times longer.
  • More efficient ground stabilisation with the Allu 3D Positioning System
    January 6, 2017
    The Allu 3D Positioning System will make ground stabilisation works more efficient and more cost-effective, according to the Finnish manufacturer. The GPS-guided system works in conjunction with Allu’s PMX mixing head, which is mounted on an excavator. It is made up from four modules – computer unit with software, touch screen, base station and GPS antennas positioned on the mixing unit. Often used in road construction to firm up soft ground, the ground stabilisation process sees the binder material fed in
  • More efficient ground stabilisation with the Allu 3D Positioning System
    April 19, 2013
    The Allu 3D Positioning System will make ground stabilisation works more efficient and more cost-effective, according to the Finnish manufacturer. The GPS-guided system works in conjunction with Allu’s PMX mixing head, which is mounted on an excavator. It is made up from four modules – computer unit with software, touch screen, base station and GPS antennas positioned on the mixing unit. Often used in road construction to firm up soft ground, the ground stabilisation process sees the binder material fed in
  • Faresin shows upgraded telehandlers
    January 6, 2017
    Faresin Industries has expanded its telescopic handler range with the addition of the FH8.40 and the rotating Storm 22.45 evo. The FH8.40 sits in the range between the established FH7.45 and the FH9.30. The machine has a capacity of 4tonnes with a maximum lift height of 8m. Higher up the lifting scale, the Storm 22.45 rotating handler can manage up to 45tonne lifts, with a maximum height of 22m.