Skip to main content

Sleipner’s highlights system for moving excavators

Sleipner will explain the principle behind its “revolutionary method to improve the overall productivity in open-pit mines, quarries and construction sites.” The improvement is based on moving excavators around the site much faster than before, and additionally the Sleipner method saves time and money and considerably increases the excavators’ life, says the company.
February 13, 2013 Read time: 2 mins
Lafarge Aggregates’ Whitwell Quarry, UK, acquired a Sleipner in 2012. It is used to move a Volvo EC700 excavator
7155 Sleipner will explain the principle behind its “revolutionary method to improve the overall productivity in open-pit mines, quarries and construction sites.”

The improvement is based on moving excavators around the site much faster than before, and additionally the Sleipner method saves time and money and considerably increases the excavators’ life, says the company.
With Sleipner, it is possible to move machines up to the weight of 550tonnes.

Sleipner says its system is essentially a dolly system, consisting of large wheels, and ramps with axles. One end of the excavator tracks is driven on the ramps so that the tracks are lifted off the ground. Then the excavator turns around, places the boom on the bed of a dump truck and lifts the other end of tracks by the hydraulic force of the boom. As the whole excavator is now above the ground, it is easily transported by the truck to the desired location on site.

“The whole transporting process is carried out in a fraction of time compared to walking the same distance on tracks,” says Sleipner.

“The Sleipner method will reduce the transportation time up to 80%, which increases the efficiency and productivity of the excavator. The system considerably reduces the wear factor to the whole machine but in particular, to tracks and undercarriage. With Sleipner, the lifetime of the undercarriage is doubled or even tripled.” It is also said to make maintenance and service easier, faster and more cost-efficient, because the machine can be moved to the workshop instead of organising the service under the open sky.”
The system can be modified to fit all excavator brands and models from 20-550tonnes.

Stand: B3.112

%$Linker: 2 Asset <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 52005 0 oLinkExternal www.sleipner.fi www.sleipner.fi false /EasySiteWeb/GatewayLink.aspx?alId=52005 false false%>

 

%$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 11560 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/bauma-2013/video/ true false%>

For more information on companies in this article

Related Content

  • CTE develops new high reach access platform
    February 15, 2013
    A new platform line has been launched by CTE, the B-Lift 390 High Range, a truck-mounted high range telescopic platform which is able to meet the requirements of various markets. The platform reaches 39 m of working height with 26.3m of maximum outreach and 450kg of maximum loading capacity. It has a telescopic boom (4 elements) with main boom and 3 telescopic extensions and H stabilisation system.
  • Anaconda shows off screener and conveyor
    February 26, 2013
    Anaconda Equipment International will have two products on display at its first bauma: the DF410 tracked screener and a TR60 18m track-mounted stockpiling conveyor. The DF410 entry level screener can screen and stockpile up to 250tonnes/hour of material into three sizes, and is said to be ideal for those restricted by working area in urban areas.
  • Bridge building in miniature by Cimolai
    January 6, 2017
    Bespoke equipment supplier Cimolai Technology is exhibiting a model of the equipment it supplied for a Bulgarian bridge project. Construction of the bridge entailed lifting and positioning pre-cast sections weighing up to 260tonnes. Cimolai designed, built and supplied a bespoke cantilever lifting system to sit atop the centre pillar and simultaneously hoist the blocks from barges 42m below on the river Danube. The company said its European contracting customers are increasingly winning orders further afiel
  • Bridge building in miniature by Cimolai
    April 19, 2013
    Bespoke equipment supplier Cimolai Technology is exhibiting a model of the equipment it supplied for a Bulgarian bridge project. Construction of the bridge entailed lifting and positioning pre-cast sections weighing up to 260tonnes. Cimolai designed, built and supplied a bespoke cantilever lifting system to sit atop the centre pillar and simultaneously hoist the blocks from barges 42m below on the river Danube. The company said its European contracting customers are increasingly winning orders further afiel