Skip to main content

Six years for Belgrade-Novi Sad highway

Total cost of the 100-km project in Serbia is estimated at €1.6 billion and will be completed by the Chinese company Shandong Hi-Speed Group.
By David Arminas September 17, 2024 Read time: 2 mins
Novi Sad: faster travel times to the historic city are coming (image © Xbrchx/Dreamstime)

Construction of the Belgrade-Zrenjanin-Novi Sad Highway in Serbia is expected to take around six years, according to the Serbian Minister of Construction, Transport and Infrastructure.

Goran Vesic said that the total cost of the 100km project is estimated at €1.6 billion and will be completed by the Chinese company Shandong Hi-Speed Group Corporation working with various Serbian contractors.

Work will include demolition of the existing Sava Bridge, according to a report by the Serbian news agency Tanjug. The 430m-long, 40-wide steel tied arch bridge, which opened in 1942, crosses the River Sava within Belgrade. It is the smallest road bridge in the Serbian capital and is used both for car and tram traffic.

Serbian prime minister Miloš Vučević, who toured the constructions site, said he believes that the work will be completed on time, noting that Shandong Hi-Speed has so far respected deadlines and quality and fulfilled what was agreed upon.

Section one of the project involves construction of 65km of highway between Ovca and Zrenjanin and then section two of 35km between Zrenjanin and Novi Sad, as well as two bridges over the Tamis River, one bridge over the Tisa River and a bridge over the Begei River.

Shandong Hi-Speed Group Corporation or Shandong Gaosu Group, is a solely state-owned enterprise in Jinan, China, owned by the Shandong Provincial People's Government. It is mainly engaged in investment, construction and operation of highways, expressways, bridges, railways, rail transits, harbours, shipping and logistics.

For more information on companies in this article

Related Content

  • Dragados among six in the running for fourth Panama bridge deal
    August 23, 2016
    All six consortia that submitted documents in May to design and build a fourth bridge over the Panama Canal have pre-qualified, according to media reports. The companies officially vying for the estimated US$1 billion contract are: • Dragados • Consorcio CCB: Constructora Norberto Odebrecht, Odebrecht Engenharia e Construcao International • Consorcio Hyundai, Sacyr JV • Consorcio Astaldi – Daelim • Consorcio Panamá Cuarto Puente: China Communications Contruction Company, China Harbour Engi
  • New Columbia River bridge proposed
    December 2, 2020
    A new bridge spanning the Columbia River has been proposed.
  • Chile awards CRCC major Talca-Chillán upgrade
    April 14, 2021
    China Railway Construction Corporation will upgrade and operate a section of Route 5.
  • India’s capital highway project will improve transport connections
    October 10, 2017
    Huge numbers of construction machines as well as plant and equipment are working overtime, backed by mammoth manpower, to meet the targeted completion deadline of March 2018 for India’s Eastern Peripheral Expressway (EPE). The 135km arterial route is being built with six lanes and surrounds India’s National Capital, Delhi, its National Capital Region (NCR) and the industrially developed North Indian states of Haryana and Uttar Pradesh.