Skip to main content

Six years for Belgrade-Novi Sad highway

Total cost of the 100-km project in Serbia is estimated at €1.6 billion and will be completed by the Chinese company Shandong Hi-Speed Group.
By David Arminas September 17, 2024 Read time: 2 mins
Novi Sad: faster travel times to the historic city are coming (image © Xbrchx/Dreamstime)

Construction of the Belgrade-Zrenjanin-Novi Sad Highway in Serbia is expected to take around six years, according to the Serbian Minister of Construction, Transport and Infrastructure.

Goran Vesic said that the total cost of the 100km project is estimated at €1.6 billion and will be completed by the Chinese company Shandong Hi-Speed Group Corporation working with various Serbian contractors.

Work will include demolition of the existing Sava Bridge, according to a report by the Serbian news agency Tanjug. The 430m-long, 40-wide steel tied arch bridge, which opened in 1942, crosses the River Sava within Belgrade. It is the smallest road bridge in the Serbian capital and is used both for car and tram traffic.

Serbian prime minister Miloš Vučević, who toured the constructions site, said he believes that the work will be completed on time, noting that Shandong Hi-Speed has so far respected deadlines and quality and fulfilled what was agreed upon.

Section one of the project involves construction of 65km of highway between Ovca and Zrenjanin and then section two of 35km between Zrenjanin and Novi Sad, as well as two bridges over the Tamis River, one bridge over the Tisa River and a bridge over the Begei River.

Shandong Hi-Speed Group Corporation or Shandong Gaosu Group, is a solely state-owned enterprise in Jinan, China, owned by the Shandong Provincial People's Government. It is mainly engaged in investment, construction and operation of highways, expressways, bridges, railways, rail transits, harbours, shipping and logistics.

For more information on companies in this article

Related Content

  • Serbia in talks with Shandong Hi-Speed and China Road and Bridge
    October 22, 2014
    Talks are underway between the Serbian Ministry of Construction, Transport and Infrastructure and two Chinese companies for construction and maintenance the two sections of the Belgrade-Pozega part of the E-763 motorway. The two Chinese companies, Shandong Hi-Speed Group and the China Road and Bridge Corporation (CRBC), are hoping to build the 18km stretch between Surcin and Obrenovac, the 31km between Preljina and Pozega and the 103km between Obrenovac and Preljina. No value of the work has been conf
  • Serbia highway 50% complete
    January 14, 2025
    A key Serbian highway is 50% complete.
  • Chinese firms to work on Serbia’s Corridor 11 project
    November 30, 2015
    Serbia and China have signed a memorandum of understanding for construction of two sections of Serbia’s Corridor 11. The MoU was inked in during Serbian Prime Minister Aleksandar Vucic’s visit to the Chinese capital Beijing last week. Serbia’s Tanjug news agency reported that Vucic said the deal was worth around €209 million and included construction of the 18km Surcin-Obrenovac bridge. Corridor 11 runs from the Serbian capital Belgrade southwest to the border with Montenegro, another member state of
  • Serbia and Bosnia consider options for a Belgrade-Sarajevo project
    December 19, 2016
    Serbia and Bosnia have started talks on constructing a fast highway between the Serbian capital Belgrade and Sarajevo, capital of Bosnia and Herzegovina. Serbian Vice President Zorana Mihajlovic met with the Bosnian minister of transport, Ismir Jusko, to agree on forming a joint working group to consider routes and road construction, according to the Serbian newspaper B92. Mihajlovic said that Serbia's main focus is for building the 100km Pozega-Visegrad section, of which 60km is in Serbia and 40km in