Skip to main content

Simplex Infrastructures is low bidder for Oman’s Batinah Expressway

Simplex Infrastructures, the Indian construction firm, has emerged as the low bidder for the third phase deal for Oman's Batinah Expressway. The firm submitted a US$ 301.12million (OMR 301.12million) bid for the work. Some 16 firms are bidding for the deal, which involves building 34km of the 265km road. The second lowest bid of US$322million (OMR 124.4million) was submitted by both Turkey's Makyol Gulf and Oman Roads Engineering. The fourth and fifth packages for the Batinah Expressway project have also be
May 24, 2012 Read time: 1 min
5716 Simplex Infrastructures, the Indian construction firm, has emerged as the low bidder for the third phase deal for Oman's Batinah Expressway.

The firm submitted a US$ 301.12million (OMR 301.12million) bid for the work. Some 16 firms are bidding for the deal, which involves building 34km of the 265km road. The second lowest bid of US$322million (OMR 124.4million) was submitted by both Turkey's Makyol Gulf and Oman Roads Engineering. The fourth and fifth packages for the Batinah Expressway project have also been recently tendered.

For more information on companies in this article

Related Content

  • Oman launches road and bridge design guide
    December 15, 2017
    The Sultanate of Oman has produced a guide for road design and standardisation of roads and bridges in the Persian Gulf of state. The Times of Oman reported that the four-volume guide was launched by Ahmed bin Mohammed Al Futaisi, minister of transport and communications. The first and the second volume cover design of roads and bridges. The third volume is for standard construction specifications. The guide also includes the most important amendments to the regulations and safety of traffic to come in
  • Zimbabwe highway project faces delay
    July 12, 2018
    The project to build Zimbabwe’s crucial north-south highway link is facing delays, with the contract now having to be re-awarded. The tender was originally awarded to an Austrian firm, Geiger International, but with progress having proven very slow this has been withdrawn. The deal has not yet been re-awarded. But the Zimbabwe Government is at present in discussions with the second bidder from the original tender process, Anhui Foreign Economic Construction Group Limited (AFECC), over the contract. The hig
  • Implementation of road building projects in Russia’s Moscow may be significantly delayed
    May 15, 2014
    Implementation of some large-scale investment projects for road building in Russia’s capital Moscow may be significantly delayed A series of major documentation issues are the cause of the problem. These have delayed projects for up to nine tenders on the total sum of US$2.6 billion (95 billion rubles), with anomalies having been found by the Russian Federal Anti-Monopoly Service.
  • India’s new highway project
    March 24, 2017
    India’s Eastern Peripheral Expressway project is now moving forward - Partha Pratim Basistha reports. Work on the 12- year pending, National, Eastern Peripheral Expressway-2, surrounding India’s National Capital, Delhi and its National Capital Region (NCR) has finally commenced. The project involves the North Indian states of Haryana and Uttar Pradesh and this development follows the approval of India’s Supreme Court. The project was held up due to land acquisition issues. Contractors are now in the process