Skip to main content

Simex’s versatile tool helps in tunnel excavation duties

Italian firm Simex has developed a versatile tool for use in tunnel excavation applications. This proven piece of equipment has been used to help construct a key tunnel link in Italy, close to the border with Switzerland. Work on the Varzo Tunnel has been carried out by Italian contractor Ceprini Costruzioni (CC).
March 13, 2013 Read time: 2 mins
Italian firm 1141 SIMEX has developed a versatile tool for use in tunnel excavation applications. This proven piece of equipment has been used to help construct a key tunnel link in Italy, close to the border with Switzerland. Work on the Varzo Tunnel has been carried out by Italian contractor Ceprini Costruzioni (CC).

The final phase of this three-phase project required the installation of two-hinged steel ribs every 1.75m, anchored to ties with a C-shaped fastening element (totalling 44 elements). Another task was the laying of a 10x10cm, 6mm diameter wire mesh covering up to 18cm of fibre-reinforced shotcrete. One of the major challenges of the third phase was to cut around 20cm deep and 40cm wide into the crown of the tunnel in order to create the inserts for the steel ribs.  A solution to the problem was offered by Simex, which designed a special rotary cutter derived from the model TF 800.

Attached to a 2300 Komatsu PC138 US short-radius excavator, and featuring a modified boom and special bracket (both supplied by Grifo workshops in Perugia), the rotary cutter made it possible to make the inserts for the steel ribs.  The use of a hydraulic breaker for the application was immediately discarded by CC due to the length of time associated with its use and the lack of optimum precision, with the possible introduction of dangerous vibrations into the crown near the deteriorated area. CC decided to use a pair of Komatsu PC 138 US excavators and two Simex TF 800/V rotary cutters. The cutters were equipped with drums measuring a width of 400mm and diameter of 1100mm, and fitted with 144 Betek VC 33 bits with a 22mm bit holder.  Both cutters were said to have proven productive and reliable and were operated without interruption for 164 hours each.

Stand: B3.222

www.simex.it

View more videos
View more stories

For more information on companies in this article

Komatsu

Related Content

  • Doka showcases Cut&Cover tunnel construction solution
    February 7, 2013
    Austrian firm Doka will be showcasing at bauma its first system to be specifically designed and optimised for cut-and-cover tunnel construction. With Doka CC (Cut and Cover), different types of traffic tunnel, such as rail or road tunnels, are said to be able to be built quickly, efficiently and safely. Doka says the creation of its innovative tunnel system was made possible only by the use of hi-tech construction materials and products such as the Composite formwork beam I tec 20. The choice of high-grade
  • Doka’s UniKit is a quick way to support heavy concrete pours
    April 19, 2016
    Doka’s new UniKit is a modular shoring system for heavy civil engineering applications. Designed to be quick and easy to erect in a number of different configurations, UniKit provides a steel-girder like structure which can support loads from bridge deck or beam concrete pours. “It’s an efficient way to construct infrastructure without stopping existing infrastructure – such as roads – running underneath,” said Doka’s director of research and development Johann Peneder.
  • Zhejiang Jiashao Bridge Investment & Development Co
    April 6, 2017
    Located in Zhejiang Province of China, Jiashao Bridge spans the Qiantang River and connects the cities of Jiaxing and Shaoxing. The total length of the bridge project is 10.14km and carries an eight-lane expressway The Qiantang River suffers from a high flow rate of up to 7.5m/s. As the tidal range is around 7-9m, the water depth is less than 2m in time of low level tide, so ships can only move at high tide and large scale ship-lifting equipment cannot be used downstream of Jiashao Bridge. However, to
  • Developments in concrete road construction
    February 7, 2012
    Innovative developments are pushing forward concrete road construction techniques. The concrete road sector looks to benefit from some key innovations and developments now coming to market or being employed in different territories. Irregular weather and environmental conditions can alter the rate at which concrete cures, with a risk of plastic shrinkage cracks that can compromise the integrity of a pavement. Contractors cannot control the environmental conditions of a paving project and when weather patter