Skip to main content

Simex’s versatile tool helps in tunnel excavation duties

Italian firm Simex has developed a versatile tool for use in tunnel excavation applications. This proven piece of equipment has been used to help construct a key tunnel link in Italy, close to the border with Switzerland. Work on the Varzo Tunnel has been carried out by Italian contractor Ceprini Costruzioni (CC).
March 13, 2013 Read time: 2 mins
Italian firm 1141 SIMEX has developed a versatile tool for use in tunnel excavation applications. This proven piece of equipment has been used to help construct a key tunnel link in Italy, close to the border with Switzerland. Work on the Varzo Tunnel has been carried out by Italian contractor Ceprini Costruzioni (CC).

The final phase of this three-phase project required the installation of two-hinged steel ribs every 1.75m, anchored to ties with a C-shaped fastening element (totalling 44 elements). Another task was the laying of a 10x10cm, 6mm diameter wire mesh covering up to 18cm of fibre-reinforced shotcrete. One of the major challenges of the third phase was to cut around 20cm deep and 40cm wide into the crown of the tunnel in order to create the inserts for the steel ribs.  A solution to the problem was offered by Simex, which designed a special rotary cutter derived from the model TF 800.

Attached to a 2300 Komatsu PC138 US short-radius excavator, and featuring a modified boom and special bracket (both supplied by Grifo workshops in Perugia), the rotary cutter made it possible to make the inserts for the steel ribs.  The use of a hydraulic breaker for the application was immediately discarded by CC due to the length of time associated with its use and the lack of optimum precision, with the possible introduction of dangerous vibrations into the crown near the deteriorated area. CC decided to use a pair of Komatsu PC 138 US excavators and two Simex TF 800/V rotary cutters. The cutters were equipped with drums measuring a width of 400mm and diameter of 1100mm, and fitted with 144 Betek VC 33 bits with a 22mm bit holder.  Both cutters were said to have proven productive and reliable and were operated without interruption for 164 hours each.

Stand: B3.222

www.simex.it

View more videos
View more stories

For more information on companies in this article

Komatsu

Related Content

  • Excavation offering
    July 16, 2012
    There are various ways of building a tunnel, and for excavation jobs many contractors prefer to use versions of standard machines that have instead been converted to suit the confines of tunnelling applications. Some contractors opt to adapt their own units and with ventilation being an issue in underground work, engine emissions are a key focus when adapting machines. Exhaust filters and other after treatment solutions are usually required and there are an array of off-the-shelf packages available as well
  • Mecalac launches four-wheel steer telescopic loader range
    February 8, 2013
    Mecalac is expanding its telescopic handler offering with the introduction of a line of four-wheel steer telescopic machines. The AT series will initially consist of two machines the AT900 and the AT1050, both using what Mecalac calls Z plus kinematics to provide strong breakout forces with a parallel lift. The AT900 weighs 6,554kg and can be used with 0.9-1.5m3 capacity buckets. The larger AT1050 has been designed to work with 1.05-1.6m3 buckets and offers slightly high breakout forces and dump height.
  • Mecalac launches four-wheel steer telescopic loader range
    January 6, 2017
    Mecalac is expanding its telescopic handler offering with the introduction of a line of four-wheel steer telescopic machines. The AT series will initially consist of two machines the AT900 and the AT1050, both using what Mecalac calls Z plus kinematics to provide strong breakout forces with a parallel lift. The AT900 weighs 6,554kg and can be used with 0.9-1.5m3 capacity buckets. The larger AT1050 has been designed to work with 1.05-1.6m3 buckets and offers slightly high breakout forces and dump height.
  • Emergent markets key for formwork sector growth
    May 21, 2014
    Central and south-east Europe are hotbeds for new highway infrastructure projects utilising cutting-edge formwork solutions, while a number of leading formwork manufacturers are also looking at emergent markets for growth. Guy Woodford reports Travelling between Hungary’s capital Budapest and Southern Dalmatia now takes less time thanks to the Pan-European Corridor Vc – European route 73. Numerous tunnels and bridges are erected along the 397km stretch of the European route 73 through Bosnia owing to the