Skip to main content

Sibmost to build first phase of Siberian bridge

Sibmost and the Automobile Roads Department of the Krasnoyarsk Region have signed a US$371.07million (RR12billion) contract to construct the first phase of the fourth highway bridge in Krasnoyarsk, Siberia.
June 8, 2012 Read time: 1 min
5872 Sibmost and the Automobile Roads Department of the Krasnoyarsk Region have signed a US$371.07million (RR12billion) contract to construct the first phase of the fourth highway bridge in Krasnoyarsk, Siberia.

For more information on companies in this article

Related Content

  • Controversial Russian bridge opens
    August 10, 2018
    The first stage of a controversial Russian bridge project is now complete, with the link having been opened to use by cars and buses. The Kerch Strait bridge spans the Black Sea, connecting Russia’s Taman Peninsula in Krasnodar with Crimea, the latter having been controversially annexed by Russia from Ukraine in 2014. The official opening of the 19km-long bridge was carried out by Russia’s president, Vladimir Putin, who drove across the link in a Russian-manufactured Kamaz truck to reach the city of Kerch.
  • Gordie Howe Bridge progresses with community support money pledged
    June 18, 2019
    The Windsor-Detroit Bridge Authority and other agencies involved in the US$4.25 billion Gordie Howe International Bridge have pledged millions of dollars in community support. WDBA, contractor Bridging North America, the US state of Michigan and the federal Canadian government announced the support plan, which involves more than 30 agencies and organisations, according to a report by the Canadian Broadcasting Corporation. The plan includes a $15 million Neighbourhood Infrastructure Strategy for both s
  • $303 million Lowell bridge replacement
    June 12, 2025
    Skanska is handling the $303 million Lowell bridge replacement in the US
  • Bridge collapse disaster in Baltimore
    March 26, 2024
    A ship collision has caused a highway bridge collapse in Baltimore.