Skip to main content

Sibmost to build first phase of Siberian bridge

Sibmost and the Automobile Roads Department of the Krasnoyarsk Region have signed a US$371.07million (RR12billion) contract to construct the first phase of the fourth highway bridge in Krasnoyarsk, Siberia.
June 8, 2012 Read time: 1 min
5872 Sibmost and the Automobile Roads Department of the Krasnoyarsk Region have signed a US$371.07million (RR12billion) contract to construct the first phase of the fourth highway bridge in Krasnoyarsk, Siberia.

For more information on companies in this article

Related Content

  • China’s CMBE wins Padmar bridge, Bangladesh build contract
    May 28, 2014
    China Major Bridge Engineering Company (CMBE) has won the US$1.55 billion contract to build the main structure of Bangladesh's Padma bridge. A 100-year guarantee will be provided by CMBE for the 10km long 25m wide bridge as part of the contract secured from the Bangladeshi government. According to Bangladesh's Finance Minister Ama Muhith, a formal agreement will be signed with CMBE at some stage in June 2014. Around 6.15km of Padma bridge will be constructed over Padma river, with the remainder built on
  • Romania’s Cosmeşti Bridge work underway
    April 21, 2022
    The existing Cosmeşti Bridge, which opened in 1924, is a combined road and rail structure.
  • Possible PPP for Mulalo-Loboguerrero
    September 9, 2024
    The current contract is a design-build-finance-operate-maintain for upgrades and new lanes for the 32km-long project in the Valley of the Cauca, Colombia.
  • Mostotrest won another tender for building of Moscow-St Petersburg highway
    February 20, 2014
    The award for a key stretch of the Moscow-St Petersburg highway has been awarded - Eugene Gerden writes As expected by analysts, Mostotrest, owned by the Rotenberg brothers, won the tender for the construction of the sixth and longest section of the Moscow-St Petersburg highway. Under the conditions of the tender the company will build 209km of the highway (334-543km), which will pass through the Tver and Novgorod regions of Russia. The cost of construction is 144.6 billion Rubles (US$4.51 billion), 16 bill