Skip to main content

Sibmost to build first phase of Siberian bridge

Sibmost and the Automobile Roads Department of the Krasnoyarsk Region have signed a US$371.07million (RR12billion) contract to construct the first phase of the fourth highway bridge in Krasnoyarsk, Siberia.
June 8, 2012 Read time: 1 min
5872 Sibmost and the Automobile Roads Department of the Krasnoyarsk Region have signed a US$371.07million (RR12billion) contract to construct the first phase of the fourth highway bridge in Krasnoyarsk, Siberia.

For more information on companies in this article

Related Content

  • Road transport key to Africa's trade links
    February 17, 2012
    Road transport is the key to improving Africa's links within its own territory, and further afield as Patrick Smith reports. Development of road transportation is the key to the future of the African economy, and countries on the continent are making great strides. According to a report by a transport infrastructure expert at the New Partnership for Africa's Development (NEPAD), within the next 15 years the value of trade in Africa could reach US$250 billion if a $32 billion investment is made to integrate
  • New Atlanta express lanes open
    September 14, 2018
    Drivers in the US city of Atlanta will benefit from reduce congestion and faster journeys with the opening of new reversible toll lanes.
  • US road tunnel celebrates anniversary
    June 6, 2022
    An important US road tunnel link is celebrating its anniversary.
  • Interest strong for Colombia key tunnel project
    January 22, 2019
    Interest is strong in the project to complete Colombia’s key tunnel construction contract. In all 23 firms have shown interest in the package of works to complete the La Linea tunnel project, according to the Colombian national road institute (Invias). The Colombian Government is providing US$204.5 million to complete the project. The current target is for the tunnel to be completed by 2020, although the link was originally supposed to be ready for traffic in late 2016. Construction work on the link commenc