Skip to main content

Siberian highway rebuild

A budget of close to US$11 billion is being set aside to rebuild the Elantsy-Khuzhir highway in Siberia.
February 20, 2012 Read time: 1 min
A budget of close to US$11 billion is being set aside to rebuild the Elantsy-Khuzhir highway in Siberia. The section in Olkhon district will be rebuilt first. Other stretches requiring reconstruction include the Irkutsk-Kachug-Zakhal section in the Ekhirit-Bulagat district and Pivovarikha-Novolisikha in the Irkutsk district.

Related Content

  • Renovation work commencing on Russia’s Scandinavia Highway
    February 26, 2014
    Upgrade work looks set to commence on the Scandinavia Highway at the end of 2014. The design work for three of the highway stretches has been completed and preparatory work has commenced on the first section. The design work for the fourth and fifth sections will commence once the upgrade work is underway on the first, second and third stretches. The project is due for completion in 2019 and will see the highway being improved and widened, with three lanes in either direction along its length. The work also
  • Czech road plans call for major construction
    January 31, 2018
    The Czech Republic is setting out its programme to develop its road infrastructure network. The plans call for work to build 360km of roads and highways as well as maintaining existing stretches. The construction plans include work on the Prerov section of the D1 highway, a stretch of the D40 from Hulin to Frystak, the Hodejovice section of the D3 highway and the Frydek-Mistek by-pass. They also include work to two sections each of the D35 highway and D11 highway as well as a number of bypasses for the D6
  • US$4.6 billion Atlanta road project nears completion
    September 24, 2024
    A US$4.6 billion road project in Atlanta, Georgia is nearing completion.
  • New Moscow’s massive motorway building and road maintenance programme
    February 5, 2015
    A huge programme of works is planned for New Moscow. This is aimed at adding extra capacity. The plan calls for the building or reconstruction of over 120km of roads within the next four years. About 600km of roads will be built in the Troitsky and Novomoskovsky (New Moscow) administrative districts by 2035. Most of the new roads will be built with four lanes, allowing two in either direction. The Central Ring Road is a priority project. A road between the Kommunarka village and the Yuzhnoe Butovo district