Skip to main content

Severn Bridge to have weight restrictions

The restrictions start May 27 when heavy goods vehicles must use the nearby cable-stayed M4 motorway Prince of Wales Bridge between England and Wales.
By David Arminas April 15, 2025 Read time: 2 mins
Since the bridge opened nearly 60 years ago, the size and weight of heavy goods vehicles have increased significantly, some increasing rising from 22 tonnes to 44 tonnes (image courtesy National Highways)

England’s road agency National Highways is introducing a 7.5 tonne weight limit for vehicles using the Severn Bridge after inspections showed deterioration to the supporting cables.

The suspension Severn Bridge, which opened in 1966, carries the M48 motorway over the Severn River which separates England and Wales. National Highways said there has been concern about the state of the cables since inspections in 2022 and 2023. Further laboratory testing has revealed that the main cables are deteriorating.

The weight restrictions come into force May 27 which means heavy goods vehicles will have to use the nearby 30-year-old cable-stayed M4 motorway Prince of Wales Bridge to travel between England and Wales. The weight restriction will remain in place for an estimated 12 to 18 months, depending on further investigations and while National Highways develops and installs a medium-term solution.

National Highways also said that it is considering installing automatic number plate recognition (APNR) to support enforcement of the new weight restriction.

According to the road agency, the weight restriction will remain in place for 12 to 18 months, depending on further investigations and while National Highways develops and installs a medium-term solution.

“While the bridge remains safe, it was not designed and built for today’s levels or weight of traffic,” said Chris Pope, programme delivery manager for National Highways. “Vehicles have got heavier and traffic levels have increased significantly over the last 60 years putting greater load on the cables. “As with all our structures, we will continue to monitor the bridge and ensure it remains safe for users.”

The Severn Bridge carried around 32,000 vehicles daily in 2024, 3,270 of which were heavy goods vehicles over 7.5 tonnes, meaning around 10 percent of traffic will be diverted via the M4 Prince of Wales Bridge once the restrictions are in place.

The size and weight of heavy goods vehicles - trucks - have increased significantly due to evolving transport demands, some rising from 22 tonnes to 44 tonnes. Since the tolls were removed on the bridge in 2018 there has been a 34% increase in traffic and these changes mean a substantial increase in weight over the bridge, for which it was not designed, noted National Highways.
 

For more information on companies in this article

Related Content

  • Road safety is an EU priority
    March 2, 2012
    The preparation of the new EU Road Safety Policy for the next decade will take place during Spain's presidency of the EU. Patrick Smith reports. An the past 10 years, half a million people have been killed on European Union roads, with road crashes costing an annual €160 billion or 2% the EU's GDP.
  • Lower Thames Crossing gets green light
    March 26, 2025
    The 14.5-mile project near London will include a 2.6-mile tunnel under the Thames River and come at a cost of around £8.3 billion.
  • The radically changing face of UK highways management
    May 14, 2014
    The British Government policy paper ‘Action for Roads: A network for the 21st century’ sets out radical change to the strategic way roads are funded and managed – including plans to turn the Highways Agency into a Government-owned company and a pledge to invest over €33.4 billion (£28 billion) in roads maintenance between 2015 and 2020. Jenny Moten, Highways Agency divisional director for Network Services, gave a keynote presentation on the new approach to strategic highways management during the Road Safet
  • East End Crossing Project—Availability payment P3 in action
    July 14, 2017
    Indiana exercised its authority to use a P3 contract when it partnered with Kentucky for new bridges across the Ohio River. Barney Allison and John Smolen* explain the groundbreaking availability payment deal. Earlier this year, traffic began rolling over the new tolled Lewis and Clark Bridge spanning the Ohio River from northern Kentucky to southern Indiana. The cable-stayed bridge is part of the award-winning Ohio Bridges Project to untangle traffic within the greater metropolitan area of Louisville, Kent