Skip to main content

Severn Bridge to have weight restrictions

The restrictions start May 27 when heavy goods vehicles must use the nearby cable-stayed M4 motorway Prince of Wales Bridge between England and Wales.
By David Arminas April 15, 2025 Read time: 2 mins
Since the bridge opened nearly 60 years ago, the size and weight of heavy goods vehicles have increased significantly, some increasing rising from 22 tonnes to 44 tonnes (image courtesy National Highways)

England’s road agency National Highways is introducing a 7.5 tonne weight limit for vehicles using the Severn Bridge after inspections showed deterioration to the supporting cables.

The suspension Severn Bridge, which opened in 1966, carries the M48 motorway over the Severn River which separates England and Wales. National Highways said there has been concern about the state of the cables since inspections in 2022 and 2023. Further laboratory testing has revealed that the main cables are deteriorating.

The weight restrictions come into force May 27 which means heavy goods vehicles will have to use the nearby 30-year-old cable-stayed M4 motorway Prince of Wales Bridge to travel between England and Wales. The weight restriction will remain in place for an estimated 12 to 18 months, depending on further investigations and while National Highways develops and installs a medium-term solution.

National Highways also said that it is considering installing automatic number plate recognition (APNR) to support enforcement of the new weight restriction.

According to the road agency, the weight restriction will remain in place for 12 to 18 months, depending on further investigations and while National Highways develops and installs a medium-term solution.

“While the bridge remains safe, it was not designed and built for today’s levels or weight of traffic,” said Chris Pope, programme delivery manager for National Highways. “Vehicles have got heavier and traffic levels have increased significantly over the last 60 years putting greater load on the cables. “As with all our structures, we will continue to monitor the bridge and ensure it remains safe for users.”

The Severn Bridge carried around 32,000 vehicles daily in 2024, 3,270 of which were heavy goods vehicles over 7.5 tonnes, meaning around 10 percent of traffic will be diverted via the M4 Prince of Wales Bridge once the restrictions are in place.

The size and weight of heavy goods vehicles - trucks - have increased significantly due to evolving transport demands, some rising from 22 tonnes to 44 tonnes. Since the tolls were removed on the bridge in 2018 there has been a 34% increase in traffic and these changes mean a substantial increase in weight over the bridge, for which it was not designed, noted National Highways.
 

For more information on companies in this article

Related Content

  • Weigh-in-motion key to maximising road life
    February 24, 2012
    The market and technology for weigh-in-motion systems continues to evolve – Mike Woof writes. for both mature and developing highway infrastructure networks, traffic densities play an important role in determining road wear and life. Monitoring traffic volumes and individual vehicle weight is crucial for ensuring roads can cope in the long term and that maintenance can be planned, while the problem of overloading can be eliminated.
  • Building a replacement bridge in record time
    March 13, 2023
    The construction of a new bridge in Pittsburgh, Pennsylvania to replace a collapsed structure has been carried out in record time
  • Far from formulaic
    January 4, 2013
    Formwork solutions for the first axial suspension cable stayed bridge in India; and a four-lane road bridge in Germany’s Harz Mountains, are among the latest bridge-based formwork projects analysed by Guy Woodford. RMD Kwikform India has won the contract to design and supply shoring and formwork solutions for the first axial suspension cable stayed bridge ever built in India. The Kota Bridge’s innovative design sees a single 350m span cross the entire width of the Chambal River, with three approach spans on
  • Total Styrelf tests start in England
    April 15, 2021
    Resurfacing has started with Total Styrelf eXtreme 100 and Total Styrelf Long Life binders.