Skip to main content

Severn Bridge to have weight restrictions

The restrictions start May 27 when heavy goods vehicles must use the nearby cable-stayed M4 motorway Prince of Wales Bridge between England and Wales.
By David Arminas April 15, 2025 Read time: 2 mins
Since the bridge opened nearly 60 years ago, the size and weight of heavy goods vehicles have increased significantly, some increasing rising from 22 tonnes to 44 tonnes (image courtesy National Highways)

England’s road agency National Highways is introducing a 7.5 tonne weight limit for vehicles using the Severn Bridge after inspections showed deterioration to the supporting cables.

The suspension Severn Bridge, which opened in 1966, carries the M48 motorway over the Severn River which separates England and Wales. National Highways said there has been concern about the state of the cables since inspections in 2022 and 2023. Further laboratory testing has revealed that the main cables are deteriorating.

The weight restrictions come into force May 27 which means heavy goods vehicles will have to use the nearby 30-year-old cable-stayed M4 motorway Prince of Wales Bridge to travel between England and Wales. The weight restriction will remain in place for an estimated 12 to 18 months, depending on further investigations and while National Highways develops and installs a medium-term solution.

National Highways also said that it is considering installing automatic number plate recognition (APNR) to support enforcement of the new weight restriction.

According to the road agency, the weight restriction will remain in place for 12 to 18 months, depending on further investigations and while National Highways develops and installs a medium-term solution.

“While the bridge remains safe, it was not designed and built for today’s levels or weight of traffic,” said Chris Pope, programme delivery manager for National Highways. “Vehicles have got heavier and traffic levels have increased significantly over the last 60 years putting greater load on the cables. “As with all our structures, we will continue to monitor the bridge and ensure it remains safe for users.”

The Severn Bridge carried around 32,000 vehicles daily in 2024, 3,270 of which were heavy goods vehicles over 7.5 tonnes, meaning around 10 percent of traffic will be diverted via the M4 Prince of Wales Bridge once the restrictions are in place.

The size and weight of heavy goods vehicles - trucks - have increased significantly due to evolving transport demands, some rising from 22 tonnes to 44 tonnes. Since the tolls were removed on the bridge in 2018 there has been a 34% increase in traffic and these changes mean a substantial increase in weight over the bridge, for which it was not designed, noted National Highways.
 

For more information on companies in this article

Related Content

  • We can be Heroes
    January 11, 2023
    Paraguay’s Puente Héroes del Chaco will provide a vital transport link for the country once it is complete, Mauro Nogarin and Mike Woof report
  • Drop in US road deaths for 2024
    May 23, 2025
    The US has seen a drop in road deaths and a road safety improvement for 2024.
  • Formwork innovations help bridge building
    July 7, 2015
    A series of formwork developments are helping with challenging bridge construction projects around the world - Mike Woof writes In the Polish city of Krakow, a cost-effective cable stayed bridge is being constructed using a balanced cantilever technique. The current expansion of the Krakow metropolitan railway network (KST) requires the building of a crossing of the Krakow-Plaszow railway junction. Ensuring that daily rail operations remained unaffected during the construction of the 252m long crossing w
  • Bridge drainage solution prevents water damage
    February 10, 2012
    Pipeline & Drainage Systems (PDS), is pointing to its EnviroDeck drainage product saying that unless properly drained, water can cause severe damage to bridges, particularly on deck surfaces where it may become trapped.