Skip to main content

Serbia’s road network may benefit from major Chinese investment

Talks between the Chinese Development Bank and the Serbian Government could result in Chinese funding for Serbian highway projects. The Danube coast project and the Corridor 11 highway project have been identified. Some €400-€450 million of Chinese financing could be made available to Serbia for highway projects following the most recent series of discussions. Serbia’s Ministry for Transport is also in talks with Chinese partners for the construction of a series of highway projects.
September 27, 2012 Read time: 2 mins
Talks between the Chinese Development Bank and the Serbian Government could result in Chinese funding for Serbian highway projects. The Danube coast project and the Corridor 11 highway project have been identified. Some €400-€450 million of Chinese financing could be made available to Serbia for highway projects following the most recent series of discussions.

Serbia’s Ministry for Transport is also in talks with Chinese partners for the construction of a series of highway projects. These include 100km of the Belgrade-Cacak, Belgrade-Obrenovac, Preljina-Ljig and Lajkovac-Ljig highway projects, as well as the 100km Pojate-Preljina project. 3366 China Road and Bridge Corporation (CRBC) is the contractor showing strongest interest in the Pojate-Preljina regional highway, while a loan for the project may well come from China's Exim Bank with a repayment period of 18 years.

Serbia’s Ministry of Transport has been carrying out extensive research into the cost of highway construction in the country, with huge variations depending on topography and geology. The Serbian Ministry of Tranport has reported that the cost of construction of highways in Vojvodina county ranges from €1.5-€2.5 million/km, while in Grdelicka Klisura costs range between €10 million and €15 million/km.

Meanwhile, in the mountainous terrain between Ljig and Cacak highway construction costs around €7.5 million/km. However, the straight highway section from Obrenovac-Ljig is also costing around €7.5 million/km. Serbian contractors are building the 12km stretch of highway from Ub-Lajkovac for around €5.8 million/km.

For more information on companies in this article

Related Content

  • India plans major infrastucture investment
    February 10, 2012
    India says it turned its Commonwealth Games into a world-class success, and now it aims to do the same with its infrastructure. Patrick Smith reports. On October, 2010 India put itself on the world stage, and disaster appeared to loom as a catalogue of problems dogged its biggest ever sporting event. Costing nearly US$2 billion to stage, the most expensive Commonwealth Games ever were, according to some, in doubt.
  • Serbia’s highway construction programme is on track
    December 4, 2014
    Serbia is on schedule with its construction programme for highways and roads. The country looks set to have completed 64km of highways and 15km of parallel or link roads during 2014. This figure compares favourably with the average 50km/year construction rate across most European countries currently building highways. Meanwhile Serbian road company Koridori Srbije looks set to merge with the road company Putevi Srbije. Koridori Srbije has already built 51km of highways during 2014. The remainder should be c
  • India plans major infrastucture investment
    April 5, 2012
    India says it turned its Commonwealth Games into a world-class success, and now it aims to do the same with its infrastructure. Patrick Smith reports On October, 2010 India put itself on the world stage, and disaster appeared to loom as a catalogue of problems dogged its biggest ever sporting event. Costing nearly US$2 billion to stage, the most expensive Commonwealth Games ever were, according to some, in doubt. After years of planning some projects were incomplete, there were health scares and a br
  • Slovakia opens up more D1 motorway sections to tender
    June 9, 2015
    Slovakia’s national motorway company NDS has put out to tender two sections of the D1 motorway near Presov and Kosice. Both tenders have been published in the Official Journal of the European Union, with bid submission deadlines set for June 29. The first section is the south-west D1 by-pass of Presov at nearly 8km long, including the construction of a 2km duel-tube road tunnel Presov and estimated to cost €443.4 million. The second section is the 14.5km-long D1 Budimir to Bidovce stretch, with cost