Skip to main content

Serbian highway stretches opening

Two stretches of a key Serbian highway are opening.
By MJ Woof March 7, 2025 Read time: 1 min
Serbia will benefit from improved transport once the Danubian Corridor highway project is complete – image courtesy of © Feruza Tashmetova| Dreamstime.com


Two stretches of Serbia’s important Danubian Corridor are opening for drivers. These two highway stretches are both located close to Pozarevac.

The Danubian Corridor will measure 68km in length when complete, with 32km now open to drivers. One of the stretches measures 11km and links the Veliko Gradiste bypass with Ponikve. The other stretch measures 21km and runs from the bridge spanning the Jezeva River to the end of the Danubian Corridor.

The contractor for the project is the Chinese firm, Shandong Hi-Speed Group. Total cost for the project is estimated at €1.6 billion.

 

Related Content

  • Serbia Corridor 11 motorway works due to begin in March 2013
    January 23, 2013
    Miodrag Jocic, State Secretary from the Serbian Ministry of Construction, , said the Chinese company Shandong High Speed Group (SHSG) will begin construction of Serbia’s new Corridor 11 motorway in March 2013. The Lajkovac-Ljig section of the project is said by Jocic to be completely ready for construction. The overall project value is estimated at US$333 million. Jocic said that the parts between Surcinska Petlja to Obrenovac in Belgrade, and from Preljina to Pozega will be most likely financed with a conc
  • Serbia in talks with Shandong Hi-Speed and China Road and Bridge
    October 22, 2014
    Talks are underway between the Serbian Ministry of Construction, Transport and Infrastructure and two Chinese companies for construction and maintenance the two sections of the Belgrade-Pozega part of the E-763 motorway. The two Chinese companies, Shandong Hi-Speed Group and the China Road and Bridge Corporation (CRBC), are hoping to build the 18km stretch between Surcin and Obrenovac, the 31km between Preljina and Pozega and the 103km between Obrenovac and Preljina. No value of the work has been conf
  • Austria’s challenging highway bridge replacement
    January 20, 2025
    A challenging highway bridge replacement is planned for Austria.
  • $491 million improving roads for the Philippines
    July 15, 2025
    A budget of $491 million will help improve roads for the Philippines.