Skip to main content

Serbian highway project

In Serbia the Ministry of Infrastructure has its plans in hand for construction work on the Belgrade-South Adriatic Highway. Contractors will be invited to tender for this €507 million project shortly. The highway will provide an important link for Serbia once it is complete.
May 30, 2012 Read time: 1 min
In Serbia the 5251 Ministry of Infrastructure and Energy has its plans in hand for construction work on the Belgrade-South Adriatic Highway. Contractors will be invited to tender for this €507 million project shortly. The highway will provide an important link for Serbia once it is complete.

For more information on companies in this article

Related Content

  • Colombia’s delayed La Linea Tunnel and tertiary road development programme seeing progress
    July 6, 2017
    Progress is now being seen in Colombia with regard to key tunnel and road projects. A consortium comprising Conconcreto and CSS Constructores is to complete the 12% of work still needed to finish the La Linea Tunnel project.
  • Slovakia opens up more D1 motorway sections to tender
    June 9, 2015
    Slovakia’s national motorway company NDS has put out to tender two sections of the D1 motorway near Presov and Kosice. Both tenders have been published in the Official Journal of the European Union, with bid submission deadlines set for June 29. The first section is the south-west D1 by-pass of Presov at nearly 8km long, including the construction of a 2km duel-tube road tunnel Presov and estimated to cost €443.4 million. The second section is the 14.5km-long D1 Budimir to Bidovce stretch, with cost
  • Changes possible for Lake Mjøsa Bridge
    September 28, 2022
    The proposed four-lane wooden bridge across Norway’s Lake Mjøsa would be the second such structure and part of the new E6 highway project.
  • Auckland’s causeway project
    April 4, 2014
    When it is finished in early 2017, the causeway on Auckland’s North-western Motorway, State Highway 16, will have been raised 1.5m to stop flooding at extreme high tides. There will be four lanes city-bound and four/five lanes westbound with dedicated bus lanes in each direction, and the existing North-western cycleway that runs alongside it will be upgraded.