Skip to main content

Serbian bridge to go ahead

DELAYS are facing construction work on Serbia’s Corridor 10 highway project. The country’s present administration has explained that the previous government left debts of €300 million and that many planned projects had been left uncompleted, with only the draft of the Serbian Urban Plan being finished. The Dimitrovgrad Ring Road is opening to traffic but other links are delayed or well behind schedule. Meanwhile a €170 million deal for construction of the Zemun-Borca Bridge has been signed with Chinese comp
July 3, 2012 Read time: 1 min
DELAYS are facing construction work on Serbia’s Corridor 10 highway project.

The country’s present administration has explained that the previous government left debts of €300 million and that many planned projects had been left uncompleted, with only the draft of the Serbian Urban Plan being finished.

The Dimitrovgrad Ring Road is opening to traffic but other links are delayed or well behind schedule.

Meanwhile a €170 million deal for construction of the Zemun-Borca Bridge has been signed with Chinese company CRBC.

The 1.5km bridge, scheduled for completion in 2013, will span the Danube River and link Belgrade's municipality Zemun and the Borca area. The project also includes 21km of access roads and 85% of the project is being funded with a loan from the 3422 Chinese Exim Bank.

For more information on companies in this article

Related Content

  • New Zealand highway proposed
    June 15, 2021
    A potentially controversial tolled highway project has been proposed for New Zealand's South Island.
  • Colombia’s ANI agency is driving forward the 4G PPP programme
    April 4, 2016
    Andrade Moreno is a man on a mission. The head of Colombia's infrastructure agency ANI explains how the organisation is giving foreign companies increasing confidence to invest time and money in the country. David Arminas reports Change, especially when it touches the highest levels of South American business and politics, can bring with it personal danger. Luis Fernando Andrade Moreno, president of Colombia's National Infrastructure Agency - ANI - was aware of this when he took on the role in 2011. B
  • Major tunnel project underway in Bangladesh
    March 1, 2019
    A major tunnel construction project is now underway in Bangladesh, the first tunnel in the country to be constructed under a river.
  • Koridori Srbije signs Corridor 11 motorway deal with Shandong HSG
    May 16, 2013
    Serbian Minister of Infrastructure, Velimir Ilic, and the director of the roads company Koridori Srbije, Dmitar Durovic, say they have signed a contract agreement with the Chinese company Shandong High Speed Group, for construction of the Corridor 11 motorway, worth a total of €257.23 million (US$ 334mn). The contract has been signed by Zhu Wei, deputy director of the Chinese company, for construction of the Ljig-Preljina part of 50km. Meanwhile, a new tender is due to be called soon for construction of the