Skip to main content

Serbian bridge to go ahead

DELAYS are facing construction work on Serbia’s Corridor 10 highway project. The country’s present administration has explained that the previous government left debts of €300 million and that many planned projects had been left uncompleted, with only the draft of the Serbian Urban Plan being finished. The Dimitrovgrad Ring Road is opening to traffic but other links are delayed or well behind schedule. Meanwhile a €170 million deal for construction of the Zemun-Borca Bridge has been signed with Chinese comp
July 3, 2012 Read time: 1 min
DELAYS are facing construction work on Serbia’s Corridor 10 highway project.

The country’s present administration has explained that the previous government left debts of €300 million and that many planned projects had been left uncompleted, with only the draft of the Serbian Urban Plan being finished.

The Dimitrovgrad Ring Road is opening to traffic but other links are delayed or well behind schedule.

Meanwhile a €170 million deal for construction of the Zemun-Borca Bridge has been signed with Chinese company CRBC.

The 1.5km bridge, scheduled for completion in 2013, will span the Danube River and link Belgrade's municipality Zemun and the Borca area. The project also includes 21km of access roads and 85% of the project is being funded with a loan from the 3422 Chinese Exim Bank.

For more information on companies in this article

Related Content

  • Serbia: Putevi Srbije to build 2.4km of Corridor 11 access road
    April 14, 2015
    Serbian road contractor Putevi Srbije will build around 2.4km of access roads around the town of Ljig in central Serbia, according the state Ministry of Construction, Transport and Infrastructure. The access roads will be for the Corridor 11 motorway, which is under construction from the Serbian capital Belgrade running southwest into Montenegro, ending at the Adriatic coastal tourist town of Bar. The Belgrade-Bar motorway will be around 280km long and be the main link for a ferry service from the Ita
  • Highway developments to boost east-west transport
    February 16, 2012
    Huge highway developments are being planned and carried out to further improve East-West transport, with Central Asia a key region as Patrick Smith reports
  • Bridge of international accord from Russia-China
    May 29, 2018
    A new bridge project joining China and Russia is a sign of international accord between the two nations – Mike Woof writes A new bridge spanning what China calls the Heilongjiang River and which is known as the Amur River in Russia, is a clear sign of an important international accord between the two countries. Discussions over the bridge project were first started between China and Russia in the 1980s, with both nations seeing many changes in leadership since that time. But while the political discussion
  • Ethiopia races on with projects
    June 13, 2012
    Ethiopia is pursuing a 10-year $2.4 billion development plan, part of which are ambitious road developments. Shem Oirere reports Ethiopia is hastening its pace towards accessing a share of the East Africa commodity market and opening itself up for foreign investment through the implementation of an ambitious road development strategy, the Road Sector Development Programme (RSDP). The landlocked nation has convinced a number of international lenders of the viability of RSDP, with some of them now loosening