Skip to main content

Serbia in talks with Shandong Hi-Speed and China Road and Bridge

Talks are underway between the Serbian Ministry of Construction, Transport and Infrastructure and two Chinese companies for construction and maintenance the two sections of the Belgrade-Pozega part of the E-763 motorway. The two Chinese companies, Shandong Hi-Speed Group and the China Road and Bridge Corporation (CRBC), are hoping to build the 18km stretch between Surcin and Obrenovac, the 31km between Preljina and Pozega and the 103km between Obrenovac and Preljina. No value of the work has been conf
October 22, 2014 Read time: 1 min
Talks are underway between the Serbian Ministry of Construction, Transport and Infrastructure and two Chinese companies for construction and maintenance the two sections of the Belgrade-Pozega part of the E-763 motorway.

The two Chinese companies, 3034 Shandong Hi-Speed Group and the 3366 China Road and Bridge Corporation (CRBC), are hoping to build the 18km stretch between Surcin and Obrenovac, the 31km between Preljina and Pozega and the 103km between Obrenovac and Preljina.

No value of the work has been confirmed, Serbian news agency Tanjug reported.

However, %$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 11805 0 oLinkExternal World Highways reported Visit serbia corridor 11 motorway works due to begin in march 2013 page false /sections/general/news/serbia-corridor-11-motorway-works-due-to-begin-in-march-2013/ false false%> in January last year that construction of the Belgrade-Pozega 150km road will be financed from an already-approved Chinese loan at the interest rate of 2.5%. Among the Serbian companies that will participate in the works are Hidrotehnika, Planum and Energoprojekt. Work is scheduled to be completed within three years.

For more information on companies in this article

Related Content

  • Hidromek is developing wheeled loaders
    February 6, 2013
    Hidromek is commencing work on developing its new wheeled loader line. Export manager Anil Bingöl said, “We have started our wheeled loader project and we hope to have our first prototype machine this year.” This will feature a 3m3 bucket and will be the first in a range of wheeled loaders from the firm. Machines with bucket capacities of 4m3 and then 5m3 will be developed in due course. Testing of the first prototype will be carried out in Turkey and Bingöl said the firm intends to have its wheeled loaders
  • Chengyu makes tracks for worldwide market
    January 6, 2017
    Chinese undercarriage component manufacturer Chengyu Machinery Equipment has set its sights on increasing exports to world markets. The company makes track rollers, carrier rollers, idlers, sprockets and track chain assemblies for machines from two to 40tonnes and exports 60% of its output. It said its products are crack- and abrasion-resistant and with high quality control procedures – only 25 parts in a million fail its quality control. Both its product delivery and after-sales service levels are said to
  • Chengyu makes tracks for worldwide market
    April 22, 2013
    Chinese undercarriage component manufacturer Chengyu Machinery Equipment has set its sights on increasing exports to world markets. The company makes track rollers, carrier rollers, idlers, sprockets and track chain assemblies for machines from two to 40tonnes and exports 60% of its output. It said its products are crack- and abrasion-resistant and with high quality control procedures – only 25 parts in a million fail its quality control. Both its product delivery and after-sales service levels are said to
  • Hyundai’s HL780-9A wheeled loader among new 9A series models at bauma
    February 12, 2013
    The new HL780-9A wheeled loader from Hyundai Heavy Industries (HI) is one of five new 9A series wheeled loaders being exhibited by the South Korean company at bauma. Like its fellow Hyundai HI 9A machines, the HL780-9A complies with strict Tier 4 Interim/EU-Stage IIIB standards on engine emissions. Its engine comes with an EGR and diesel particulate filter (DPF). The DPF is automatically and/or manually regenerated, ensuring compliance with all NOx and PM values. Hyundai HI says the high performance DPF fil