Skip to main content

Serbia in talks with Shandong Hi-Speed and China Road and Bridge

Talks are underway between the Serbian Ministry of Construction, Transport and Infrastructure and two Chinese companies for construction and maintenance the two sections of the Belgrade-Pozega part of the E-763 motorway. The two Chinese companies, Shandong Hi-Speed Group and the China Road and Bridge Corporation (CRBC), are hoping to build the 18km stretch between Surcin and Obrenovac, the 31km between Preljina and Pozega and the 103km between Obrenovac and Preljina. No value of the work has been conf
October 22, 2014 Read time: 1 min
Talks are underway between the Serbian Ministry of Construction, Transport and Infrastructure and two Chinese companies for construction and maintenance the two sections of the Belgrade-Pozega part of the E-763 motorway.

The two Chinese companies, 3034 Shandong Hi-Speed Group and the 3366 China Road and Bridge Corporation (CRBC), are hoping to build the 18km stretch between Surcin and Obrenovac, the 31km between Preljina and Pozega and the 103km between Obrenovac and Preljina.

No value of the work has been confirmed, Serbian news agency Tanjug reported.

However, %$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 11805 0 oLinkExternal World Highways reported Visit serbia corridor 11 motorway works due to begin in march 2013 page false /sections/general/news/serbia-corridor-11-motorway-works-due-to-begin-in-march-2013/ false false%> in January last year that construction of the Belgrade-Pozega 150km road will be financed from an already-approved Chinese loan at the interest rate of 2.5%. Among the Serbian companies that will participate in the works are Hidrotehnika, Planum and Energoprojekt. Work is scheduled to be completed within three years.

For more information on companies in this article

Related Content

  • Liebherr 150EC-B is latest flat-top crane
    February 7, 2013
    Liebherr will show a modular design flat-top tower crane in the 150EC-B at this year’s Bauma. The 150EC-B is available in FR.tronic, with traditional contractor controls, or Litronic version with programmable logic controls. The flat-top crane can be had in 6 tonne and 8 tonne versions, with a maximum hook height of 63m and maximum working radius of 60m. Lift capacity at full radius is 1,700kg.
  • Euroswitch sensor achievement
    January 6, 2017
    Euroswitch is among those leading the way in the design and manufacture of level, pressure, temperature, speed and position sensors. The company says its mission is to develop high quality standard products and custom solutions supported by an efficient and flexible organisation with a highly skilled workforce.
  • Euroswitch sensor achievement
    April 5, 2013
    Euroswitch is among those leading the way in the design and manufacture of level, pressure, temperature, speed and position sensors. The company says its mission is to develop high quality standard products and custom solutions supported by an efficient and flexible organisation with a highly skilled workforce.
  • Nice in 2018: The Pavement Preservation & Recycling Summit (PPRS)
    November 17, 2017
    Siobhan McKelvey, president of the Paris-based International Bitumen Emulsion Federation (IBEF), explains the importance for attending next year’s Pavement Preservation & Recycling Summit. The event will be held in Nice in southern France from 26-28 March at the Nice Acropolis. One of the highlights for me that is provided by the PPRS platform is the opportunity to exchange on communication experiences throughout the world and how the challenges of promoting the role of a good road network are met.