Skip to main content

Serbia in talks with Shandong Hi-Speed and China Road and Bridge

Talks are underway between the Serbian Ministry of Construction, Transport and Infrastructure and two Chinese companies for construction and maintenance the two sections of the Belgrade-Pozega part of the E-763 motorway. The two Chinese companies, Shandong Hi-Speed Group and the China Road and Bridge Corporation (CRBC), are hoping to build the 18km stretch between Surcin and Obrenovac, the 31km between Preljina and Pozega and the 103km between Obrenovac and Preljina. No value of the work has been conf
October 22, 2014 Read time: 1 min
Talks are underway between the Serbian Ministry of Construction, Transport and Infrastructure and two Chinese companies for construction and maintenance the two sections of the Belgrade-Pozega part of the E-763 motorway.

The two Chinese companies, 3034 Shandong Hi-Speed Group and the 3366 China Road and Bridge Corporation (CRBC), are hoping to build the 18km stretch between Surcin and Obrenovac, the 31km between Preljina and Pozega and the 103km between Obrenovac and Preljina.

No value of the work has been confirmed, Serbian news agency Tanjug reported.

However, %$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 11805 0 oLinkExternal World Highways reported Visit serbia corridor 11 motorway works due to begin in march 2013 page false /sections/general/news/serbia-corridor-11-motorway-works-due-to-begin-in-march-2013/ false false%> in January last year that construction of the Belgrade-Pozega 150km road will be financed from an already-approved Chinese loan at the interest rate of 2.5%. Among the Serbian companies that will participate in the works are Hidrotehnika, Planum and Energoprojekt. Work is scheduled to be completed within three years.

For more information on companies in this article

Related Content

  • Serbia’s road network may benefit from major Chinese investment
    September 27, 2012
    Talks between the Chinese Development Bank and the Serbian Government could result in Chinese funding for Serbian highway projects. The Danube coast project and the Corridor 11 highway project have been identified. Some €400-€450 million of Chinese financing could be made available to Serbia for highway projects following the most recent series of discussions. Serbia’s Ministry for Transport is also in talks with Chinese partners for the construction of a series of highway projects.
  • Chinese firms to build three motorways in Serbia covering a combined 190km
    January 4, 2013
    Chinese companies are to take part in a number of motorway construction projects in Serbia, according to the country’s ministry of construction and urbanism. The routes will cover a combined 190km and follow the Serbian government’s December 2012 signing of a pre-contract deal for the construction of the Lajkovac-Ljig and Obrenovac-Ub sections of the Corridor 11 motorway, worth US$333 million, with the representatives of the Chinese firm Shandong High Speed Corporation. The two parts are part of the future
  • Chinese firms to work on Serbia’s Corridor 11 project
    November 30, 2015
    Serbia and China have signed a memorandum of understanding for construction of two sections of Serbia’s Corridor 11. The MoU was inked in during Serbian Prime Minister Aleksandar Vucic’s visit to the Chinese capital Beijing last week. Serbia’s Tanjug news agency reported that Vucic said the deal was worth around €209 million and included construction of the 18km Surcin-Obrenovac bridge. Corridor 11 runs from the Serbian capital Belgrade southwest to the border with Montenegro, another member state of
  • Denmark to create Rodby port to service Fehmarn Belt construction
    January 6, 2015
    The Danish government said it will create a large port area east of the small town of Rødbyhavn to facilitate construction of the future Fehmarn Belt tunnel link. The US$7.5 billion project is an 18km tunnel including two railway tunnels, two motorway tunnels and an emergency tunnel. Construction start is scheduled for later this year and should take between six and seven years. The tunnel is part of the major infrastructure project called the Fehmarn Belt Fixed Link to connect the German island of Fe