Skip to main content

Serbia highway 50% complete

A key Serbian highway is 50% complete.
By MJ Woof January 14, 2025 Read time: 2 mins
A new motorway will help boost Serbia’s economy – image courtesy of © Adam Radosavljevic| Dreamstime.com

 

Serbia’s key Morava Corridor Motorway is 50% complete. The road is being built by the joint venture partners Bechtel and ENKA.

The motorway connects the cities of Kruševac and Vrnjačka Banja. The Morava Corridor Motorway, a 112km dual highway designed for speeds up to 130km/h, runs along the West Morava River valley, linking central Serbia to Pan-European Corridors 10 and 11. 

The project will reduce travel times by half, which will accelerate the flow of people and goods, resulting in economic growth and increased investment. “This is the best highway in Serbia, and I am proud because it will mean more jobs and more investment for our country.” said Aleksandar Vučić, Serbian President at the opening event.

The motorway is not only a catalyst for economic growth, but also an opportunity for local communities to develop new skills and grow their businesses. More specifically, roughly 40% of the project’s four thousand employees are Serbian, and Bechtel has awarded 80% of its subcontracts and purchase orders to Serbian companies. 

“With each new section opening, the Morava Motorway is transforming lives for thousands of Serbians,” said Darren Mort, President of Bechtel’s Infrastructure business. “As we’ve seen around the world, making travel safer and more efficient enhances wellbeing, boosts productivity and supports local economies. This milestone adds to what has been a very exciting year for the Bechtel-ENKA team, having recently won international awards on this project for environmental stewardship, global program management and financing.”

It will be Serbia’s first digital highway, featuring a fiber optic cable alongside the road to enhance traffic management. The motorway incorporates a robust floodwater defense system, designed to protect local communities from flooding challenges that have plagued the region for centuries. It will provide access to Bosnia and Herzegovina, Montenegro and North Macedonia and includes 12 interchanges, 79 bridges, 27 overpasses, 11 underpasses, 140 culverts and 37km of river regulation.

 

For more information on companies in this article

Related Content

  • Corridor for prosperity: The 5G Road
    June 14, 2019
    The next generation of highways will be a matrix of smart, intelligent and dynamic technologies that lower maintenance costs and ensure user safety. But challenges lie ahead, as Geoff Hadwick discovered in Dubrovnik The fifth-generation road is about to provide the world’s highway authorities with a big leap forward. This “forever-open”, self-healing road will integrate innovation into infrastructure, vehicles and entire intelligent transport systems, says Adewole Adesiyun, deputy secretary general of
  • Serbia highway projects moving ahead
    September 30, 2016
    Progress is being seen in Serbia with regard to some of the country’s key highway projects. The Ljig-Preljina stretch of the Corridor 11 highway will open for traffic at the end of October 2016. The highway route will be tolled but these will not be implemented until the start of 2017. Plans are also moving ahead for the ring road project for the capital, Belgrade. Meanwhile talks are being held with the European Investment Bank (EIB) over the new highway link to run from Nis, through Merdare and over the b
  • US$2 billion road projects for Colombia
    December 19, 2024
    Road projects worth US$2 billion are ongoing for Colombia.
  • Volvo CE’s good results for Q2
    July 22, 2025
    Volvo CE is benefiting from strong results for Q2, 2025.