Skip to main content

Serbia Corridor 11 motorway works due to begin in March 2013

Miodrag Jocic, State Secretary from the Serbian Ministry of Construction, , said the Chinese company Shandong High Speed Group (SHSG) will begin construction of Serbia’s new Corridor 11 motorway in March 2013. The Lajkovac-Ljig section of the project is said by Jocic to be completely ready for construction. The overall project value is estimated at US$333 million. Jocic said that the parts between Surcinska Petlja to Obrenovac in Belgrade, and from Preljina to Pozega will be most likely financed with a conc
January 23, 2013 Read time: 1 min
Miodrag Jocic, State Secretary from the Serbian Ministry of Construction, , said the Chinese company 3034 Shandong Hi-Speed Group (SHSG) will begin construction of Serbia’s new Corridor 11 motorway in March 2013.

The Lajkovac-Ljig section of the project is said by Jocic to be completely ready for construction. The overall project value is estimated at US$333 million. Jocic said that the parts between Surcinska Petlja to Obrenovac in Belgrade, and from Preljina to Pozega will be most likely financed with a concession.

Meanwhile, the Belgrade-Pozega 150km road will be completed within three years. Among the domestic companies that will participate in the works are Hidrotehnika, Planum, and Energoprojekt. The project will be financed from an already approved Chinese loan at the interest rate of 2.5%.

Azerbaijan's company 5414 Azvirt will participate in construction of the Ljig-Preljina motorway, while Serbian domestic firms will build the Ub-Lajkovac part.

For more information on companies in this article

Related Content

  • Serbia starts in-depth talks with the Chinese for Corridor 11 work
    May 7, 2015
    Serbia has entered into “in depth” negotiations with two Chinese companies for concession contracts along the Corridor 11 motorway between Belgrade and the Montenegrin border. Shandong High Speed Group and the China Road and Bridge Corporation (CRBC) are the two Chinese companies that have passed the pre-qualification process. The project value has not been mentioned. Serbian vice president Zorana Mihajlovic said that the Chinese have requested guarantees for transport and Serbia is considering this a
  • Serbian highway plans
    March 19, 2012
    Serbian contractor Milos Trans will start work on the Serbia’s Corridor 11 highway during 2012. The firm will carry out work on the stretch running from Preljina to Takovo.
  • Work on Serbian highway to be carried out by Chinese company Shandong High Speed Group
    December 10, 2013
    Chinese firm Shandong High Speed Group is to carry out a portion of the construction activity for Serbia’s Corridor 11 highway. The company will commence work on the section between Obrenovac to Ub and from Lajkovac to Ljig shortly. The agreement was signed between the Shandong High Speed Group and the Serbian Government. Work on the project is due to for completion within 37 months. Exactly which portions of the construction work on these sections has not been revealed however. At present several sections
  • Serbia: Putevi Srbije to build 2.4km of Corridor 11 access road
    April 14, 2015
    Serbian road contractor Putevi Srbije will build around 2.4km of access roads around the town of Ljig in central Serbia, according the state Ministry of Construction, Transport and Infrastructure. The access roads will be for the Corridor 11 motorway, which is under construction from the Serbian capital Belgrade running southwest into Montenegro, ending at the Adriatic coastal tourist town of Bar. The Belgrade-Bar motorway will be around 280km long and be the main link for a ferry service from the Ita