Skip to main content

September 2017

The REO Speed Wagon has been on a Journey but has been Ridin' the storm out and Lost in a dream for some time and its Wheels are turnin' only in memory
October 12, 2017 Read time: 1 min

The REO Speed Wagon has been on a Journey but has been Ridin’ the storm out and Lost in a dream for some time and its Wheels are turnin’ only in memory

Related Content

  • Carry on Movin’ On - Michelin’s mobility event
    October 15, 2018
    Many of the great and the good in the global mobility sector gathered at this year’s Movin’ On event in Montreal. Measured regulation of technologies and safety issues were major themes, reports David Arminas Autonomous vehicles, platooning, smart intersections and safety – these were the talking points over two and half days of the Movin’ On event in Montreal. Everyone in the mobility sector is at the same point, trying to see what mobility will look like in the future. Apparent at the event was just
  • Chile’s Chacao Bridge under construction
    March 6, 2018
    Construction work on Chile’s Chacao Bridge project is now underway. The 2.75km suspension bridge will connect the Chilean mainland with Chiloe Island. The bridge structure has been designed to flex so that It can cope with severe earthquakes, which present a risk in the area. The project is costing US$700 million to carry out with South Korean company Hyundai heading the construction. Building the link should take around five years with its completion set for 2023, although the work could be finished earlie
  • Historic US bridge upgrade in Washington DC
    July 8, 2016
    A heavily-used bridge of historic importance in US capital Washington DC looks set to benefit from much-needed improvement works. The work will be part funded by a US$90 million from the US Department of Transportation. The structure of the Arlington Memorial Bridge has become degraded over time and has been highlighted in a number of reports as being in dire need of a major rebuild. The 651m bridge links Washington District with Arlington County, carrying around 68,000 vehicles/day. But in all the bridge i
  • Software solution to storm clearance
    July 24, 2012
    Inrix will collaborate with the Ohio Department of Transportation (ODoT) to use the company’s traffic information and cloud-based analytics to further the state’s goal of clearing roads statewide within three hours after major storms.