Skip to main content

September 2016

Wide clearance is required for some vehicles - image courtesy of Petra Schwimmbeck
November 14, 2016 Read time: 1 min

Wide clearance is required for some vehicles - image courtesy of Petra Schwimmbeck

Related Content

  • New developments in bitumen technology
    November 30, 2020
    From softwood in Sweden to rubber and rubble in Australia - Kristina Smith reports on new technologies which could shape tomorrow’s asphalt mixes
  • THIS is a Paving Project– The I-15 CORE
    December 20, 2012
    Provo, Utah – The scope of the I-15 Corridor Expansion Project (I-15 CORE) in the state of Utah is nearly unprecedented because of the size of the project and the short completion deadline. Twenty-four miles (38.6 km) of removal and replacement of Interstate 15 between Lehi and Spanish Fork, widening the number of traveling lanes by two, for up to six lanes in each direction in 35 months. The new 364 lane miles (586 km) of concrete roadway will be slipformed 12 or 12.5 inches (305 or 318 mm) thick for a tot
  • Skyjack shows SJ1256 telehandler and SJ85 AJ articulating boom
    March 10, 2017
    Skyjack displayed its new SJ1256 telehandler and SJ85 AJ articulating boom at CONEXPO-CON/AGG. The SJ1256 TH telehandler lifts 12,000lb and has a 56.3 ft maximum lift height, with a 6,000lb lift capacity at maximum lift height without deploying outriggers and 7,000lb lift capacity with outriggers deployed. Maximum forward reach is 42.6 ft and the machine has a Tier-IV final 107hp Deutz TCD3.6L engine that uses diesel exhaust fluid, but requires no regeneration.
  • Interest is strong in the project to build Chile’s Chacao Bridge
    March 4, 2013
    Strong interest from a wide array of contractors has been shown in the project to construct the Chacao Bridge in Chile. In all some 47 sets of terms and conditions have been sold in the pre-qualification process for the tender to design and construct the Chacao Bridge. When complete the bridge will link Chiloe Island with the mainland of Chile, in the Los Lagos region. Chile’s Ministry for Public Works is now evaluating the companies/consortia that meet the requirements to build the bridge. The contract wil