Skip to main content

Section II of Indonesia’s Cinere-Jagorawi Toll Road project launched

Work has begun on Section II of Indonesia’s Cinere-Jagorawi Toll Road. The 5.5km route is costing US$210.25 million (IDR 2.4 trillion) and Section II will have a length of 5.5km. The project by Translingkar Kita Jaya is earmarked for completion in February 2016.
March 24, 2014 Read time: 1 min
Work has begun on Section II of Indonesia’s Cinere-Jagorawi Toll Road. The 5.5km route is costing US$210.25 million (IDR 2.4 trillion) and Section II will have a length of 5.5km. The project by Translingkar Kita Jaya is earmarked for completion in February 2016.

Related Content

  • Bolivia tunnel and highway project under construction
    February 9, 2017
    In Bolivia work is progressing on the strategic Incahuasi tunnel project – Mauro Nogarin writes In southern Bolivia, the Bolivian Highway Administrator (ABC) is supervising the construction of the Incahuasi Tunnel and Monteagudo-Muyupampa-Ipati road. This work is of fundamental importance for the country as it will improve the flow of traffic and boost trade between the departments of Santa Cruz and Chuquisaca. The Monteagudo-Ipati highway project includes the Incachuasi tunnel which has a length of 96km
  • Highway projects for China’s Yunnan Province
    May 5, 2020
    Three highway projects are being planned for China’s Yunnan Province.
  • Indonesia road funding found for two highways
    June 27, 2016
    Financing looks to have been secured for major tolled highway projects in Indonesia. These highways are the 129km Pekan Baru-Dumai route, which forms part of the Trans-Sumatra highway, the 60.5km Cileunyi-Sumedang-Dawuan (Cisumwadu) road and the 39km Manado-Bitung route. A loan from the Asian Infrastructure Investment Bank (AIIB) worth some US$370.2 million is expected to provide around half of the financing required for the Pekan Baru-Dumai route. Meanwhile loans worth a total of $300.2 million from the Ex
  • Colombia road project tender process
    July 22, 2019
    The tender process for Colombia’s Buga-Buenaventura fourth generation (4G) toll road project is being planned. The tender for the 114.1km dual carriageway is being handled in two separate stretches however. One of the road stretches will be for a 55.4km section from Buga to Loboguerrero, which is expected to cost US$359.45 million. The 58.7km stretch from Loboguerrero to Buenaventura meanwhile is expected to cost $362.75 million. The Loboguerrero to Buenaventura section of the route includes building a 19km