Skip to main content

Second project for Gateway Arch restoration in Missouri, U.S.

In the U.S. state of Missouri, a second project within the US$380 million Gateway Arch grounds restoration has been given the go-ahead. Construction will start in the summer of 2013 on the initial project to put a ‘lid’ over Interstate 70, near the grounds of the Arch. The Leonor K Sullivan Boulevard, the riverfront road runs along the Mississippi River in front of the Gateway Arch, is being raised by around 0.76m. It will also be redesigned to include pedestrian and bicycle paths. Engineers working on the
February 25, 2013 Read time: 1 min
In the U.S. state of Missouri, a second project within the US$380 million Gateway Arch grounds restoration has been given the go-ahead.

Construction will start in the summer of 2013 on the initial project to put a ‘lid’ over Interstate 70, near the grounds of the Arch. The Leonor K Sullivan Boulevard, the riverfront road runs along the Mississippi River in front of the Gateway Arch, is being raised by around 0.76m. It will also be redesigned to include pedestrian and bicycle paths. Engineers working on the project's lid element, costing around $47mn, have found an estimated $11 million in savings. These savings are said to have hastened the second project: the redevelopment of the boulevard. Construction on this latter project is expected to commence in March 2014.

Related Content

  • More challenges for Stonehenge A303 scheme
    August 1, 2023
    National Highways’ Road Investment Strategy for England’s strategic roads has committed to upgrading many the remaining single carriageway sections of the A303.
  • How Florida paved the way for availability payments in the US
    November 21, 2014
    New financing models have been used to deliver key transport links in the US - * Patrick D Harder and Brandon J Davis Florida Department of Transportation’s (FDOT) public-private partnership (PPP) programme has made impressive progress, setting precedents for US transportation planning and funding. On March 26th 2014, FDOT opened 16km of new reversible express lanes as part of its US$1.8 billion I-595 Corridor Roadway Improvements Project. Just a few months later, on August 3rd 2014, FDOT opened twin tunnel
  • Scotland’s new Queensferry Crossing over the Forth Estuary
    December 23, 2015
    The new Queensferry Crossing under construction in Scotland will be the third landmark bridge spanning the Forth Estuary - Mike Woof writes When the new Queensferry Crossing over the Forth Estuary opens at the end of 2016, it will be the third landmark bridge to be built spanning this short stretch of water. Lying alongside the existing road bridge and the historic rail bridge, this new structure will be as groundbreaking as the two earlier crossings were at the time of their construction.
  • ARTBA predicts US construction infrastructure growth
    December 3, 2012
    The American Road and Transportation Builders Association’s (ARTBA) annual forecast suggests that the US transportation construction infrastructure market will show modest growth in 2013. According to ARTBA’s forecast, this segment will increase 3% to US$130.5 billion in 2013. The association’s chief economist, Dr Alison Premo Black, said that growth is expected in highway and street pavements, private work for driveways and parking lots and also airport terminal and runway work. But ARTBA predicts the brid