Skip to main content

Second project for Gateway Arch restoration in Missouri, U.S.

In the U.S. state of Missouri, a second project within the US$380 million Gateway Arch grounds restoration has been given the go-ahead. Construction will start in the summer of 2013 on the initial project to put a ‘lid’ over Interstate 70, near the grounds of the Arch. The Leonor K Sullivan Boulevard, the riverfront road runs along the Mississippi River in front of the Gateway Arch, is being raised by around 0.76m. It will also be redesigned to include pedestrian and bicycle paths. Engineers working on the
February 25, 2013 Read time: 1 min
In the U.S. state of Missouri, a second project within the US$380 million Gateway Arch grounds restoration has been given the go-ahead.

Construction will start in the summer of 2013 on the initial project to put a ‘lid’ over Interstate 70, near the grounds of the Arch. The Leonor K Sullivan Boulevard, the riverfront road runs along the Mississippi River in front of the Gateway Arch, is being raised by around 0.76m. It will also be redesigned to include pedestrian and bicycle paths. Engineers working on the project's lid element, costing around $47mn, have found an estimated $11 million in savings. These savings are said to have hastened the second project: the redevelopment of the boulevard. Construction on this latter project is expected to commence in March 2014.

Related Content

  • UK: Currie & Brown acquires Sweett Group
    September 8, 2016
    Following the offer by Currie & Brown, a leading physical assets management and construction consultancy, to acquire Sweett Group plc, it was today announced that Sweett has been delisted. The combined entity will employ approximately 2,200 employees in over 60 offices in the Americas, Europe, India, the Middle East, the UK and the US. The cost of the purchase was not given.
  • JCB targets US$8 billion access market
    February 24, 2017
    JCB has signalled its intention to become a major player in the US$8 billion powered access market. It is entering the sector for the first time with the launch of a brand new range that it has been developing and engineering in secret for the past two years. The company has taken the wraps off an initial nine all-new electric scissor models, and by the end of 2017 the newly-launched JCB Access business says will be offering a total of 27 new platforms, including scissors, articulated booms and teles
  • Romania’s important bridge project
    October 5, 2022
    Romania’s important Braila Bridge project will deliver a key crossing spanning the Danube River
  • Final touches for Seattle’s SR520 floating bridge
    November 21, 2017
    Construction crews in the US state of Washington are finishing bicycle trails and pedestrian paths leading up to the award-winning SR 520 floating bridge. The Evergreen Point Floating Bridge - officially now the Governor Albert D. Rosellini Bridge - carries Washington State Route 520 across Lake Washington in Seattle. The 2.35km-long floating span is the longest floating bridge in the world and at 35m the world's widest. It opened in April last year as a replacement for the original 50-year-old four-lane