Skip to main content

Seattle’s Alaskan Way tunnel on track

Plans are on track for construction work on Seattle’s Alaskan Way tunnel to commence in mid-2013. The massive TBM that will drive the tunnel has been tested in Japan by its manufacturer Hitachi and is now being shipped to the US. The TBM has a 17.5m diameter cutting head, making it the largest machine ever constructed. This is bigger even than the Herrenknecht machine with its 15.62m diameter cutting head built for the Bologna-Florence highway tunnel project in Italy. The new Hitachi TBM has been disassembl
March 8, 2013 Read time: 2 mins
Plans are on track for construction work on Seattle’s Alaskan Way tunnel to commence in mid-2013. The massive TBM that will drive the tunnel has been tested in Japan by its manufacturer 233 Hitachi and is now being shipped to the US. The TBM has a 17.5m diameter cutting head, making it the largest machine ever constructed. This is bigger even than the 2592 Herrenknecht machine with its 15.62m diameter cutting head built for the Bologna-Florence highway tunnel project in Italy.

The new Hitachi TBM has been disassembled into different sections for transportation to the US and is expected to arrive at the end of March 2013. The launch area for the TBM is being prepared at present and the Alaskan Way Viaduct Replacement Tunnel is scheduled to open in late 2015. When complete the 3.2km tunnel will carry State Route 99 under Downtown Seattle from the SoDo neighborhood to South Lake Union in the north. 914 Washington State Department of Transportation’s US$1.35 billion project will replace the existing 1950s vintage viaduct, which was damaged in an earthquake in 2001. The tunnel will run at a depth of up to 61m beneath the city and will carry 110,000 vehicles/day while its construction also frees up the waterfront area for redevelopment.

For more information on companies in this article

Related Content

  • Fast flyover removal with specialist demolition equipment
    July 12, 2012
    An overcrowded Indian flyover was removed in record time using specialist demolition equipment, as Patrick Smith reports Demolition of the landmark Lalbaug flyover south of central Mumbai has been completed and work on a new bigger bridge has started in India's largest city. Although the 38-year-old Sant Dnyaneshwar (Lalbaug flyover) two-lane, one-way traffic artery was serviceable and used by to 15,000 vehicles/hour, there were daily traffic jams and environmental consequences. Despite the complex and dema
  • IRF awards Parsons for its East End Crossing work in the US
    August 7, 2015
    The International Road Federation (IRF) has awarded its Global Road Achievement Award for project finance and economics to Parsons for the East End Crossing of the Ohio River Bridges Project. Parsons, which served as the technical advisor for the implementation of a public-private partnership (PPP), received the award for achievements in cost savings and accelerated project delivery. This was done through the PPP procurement process for the development, design, construction, financing, operation and m
  • Award winning bridge for North Carolina
    November 21, 2019
    A new bridge in the US state of North Carolina has won a key award for excellence – Mike Woof writes
  • First phase of Houston reversible HOV to HOT lanes completed
    April 19, 2012
    Houston’s Metropolitan Transit Authority of Harris County (Metro) working with prime contractor TransCore has commissioned the first of five reversible high occupancy toll (HOT) lane corridors. One of the most substantial undertakings of its kind to date in the United States, Metro’s conversion of high occupancy vehicle (HOV) lanes to HOT lanes will increase utilisation of the HOV system and subsequently relieve congestion in the general purpose freeway lanes. When completed, the programme will span 135k