Skip to main content

Sava River bridge completed but not open

The bridge between Croatia and Bosnia will open when custom facilities are finished next year.
By David Arminas August 16, 2022 Read time: 2 mins
Work started in 2019 on the now completed bridge to cross the Sava River between Croatia and Bosnia near the Bosnian town of Gradiška (image courtesy Integral Inženjering)

Construction of the bridge over the Sava River between Bosnia and Herzegovina and Croatia, near the Bosnian town of Bosanska Gradiška has been completed.

However, it will open only after completion of customs facilities on the Croatian side, according to media reports.

Work started in 2019 by Integral Inženjering as main contractor together with Đuro Đaković Montaža and Zagreb-Montaža. The bridge’s engineer was a joint venture of Germany-based KREBS + KIEFER Eastern Europe and Institut IGH, a private Croatian company.

The joint client was Croatia’s state highways agency Hrvatske ceste and Bosnia’s Ministry of Communication and Transport.

According to Integral Inženjering, the 462m-long and 22.6m-wide bridge is of a continuous single-cell steel box girder design with consoles on both sides.

The bridge is part of a larger project, contracted to Integral Inženjering that includes an expressway in Croatia from the bridge to run through the Croatian town of Okučani and north to the border with Hungary. It is also part of the European E-661 road, connecting Split with Banja Luka, Virovitica and Balaton.

The contract value was around €23.5 million. The European Union co-financed construction with €3.2 million in grants, which were combined with a €5.6 million favorable loan from the European Investment Bank.

Related Content

  • Breakthrough for Bosnia’s Vranduk Tunnel
    March 7, 2022
    The twin-tube Vranduk Tunnel is being built using the new Austrian tunnel method by Azerbaijan's Azvirt and Hering dd Siroki Brijeg contractors.
  • Colas-built bridge opens over River Ipoly
    August 9, 2023
    Colas divisions in Hungary and Slovakia cooperated on constructing a recently opened bridge between Ipolydamasd in Hungary and Helemba in Slovakia.
  • Croatia-Bosnia connection
    October 2, 2018
    The Svilaj Bridge connecting Croatia and the Federation of Bosnia and Herzegovina is nearly 40% complete, according to the contractors and the Croatian Motorways Directorate. Locally, the Svilaj Bridge – financially a 50-50 project between the two countries - is part of a motorway running from Beli Manastir to Osijek and on tyo Svilaj. But the route is also part of the motorway Budapest-Osijek-Sarajevo-Plocˇ which is the Pan European Corridor Vc (Corridor 5, branch c) connecting Budapest with the Adriatic.
  • Bosnia road tunnel project
    December 4, 2020
    A key Bosnian road tunnel project is underway.