Skip to main content

Sateco launches lift shaft podium

Sateco says its new lift shaft podium (PCA) makes it possible to block and secure access to lift shafts during building work. It also maximises secure work and material storage space during the time it takes to build up concrete shells. Due to its adjustable telescopic feet and the dimension markings every 10cm along its adjustment pipes, it can be perfectly adjusted between heights of 2.7m and 4m. Its wooden working platform can also be extended using sliding cross-pieces that require neither screws nor na
January 6, 2017 Read time: 2 mins
Sateco is unveiling its new lift shaft podium at Intermat 2012.
3202 Sateco says its new lift shaft podium (PCA) makes it possible to block and secure access to lift shafts during building work. It also maximises secure work and material storage space during the time it takes to build up concrete shells.

Due to its adjustable telescopic feet and the dimension markings every 10cm along its adjustment pipes, it can be perfectly adjusted between heights of 2.7m and 4m. Its wooden working platform can also be extended using sliding cross-pieces that require neither screws nor nails. The lift shaft podium can be extended from a square platform measuring 1.6m x 1.6m to a large format rectangular platform measuring 2.5m x 2.6m, in steps of 1cm length and 5cm width.

Fully foldable and collapsible, making it easy to transport, the podium is delivered with foldable access ladder with integrated safety bow for fitting between floors.

%$Linker: External 0 0 0 oLinkExternal <span class="mouselink">www.sateco-coffrages.com</span> Sateco false http://www.sateco-coffrages.com/ false false%>

%$Linker: 2 Internal 2 4824 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/intermat-2012/video/ true false%>

For more information on companies in this article

Related Content

  • Rivard’s new powerful trench workfare
    February 8, 2012
    Launched just before Intermat 2012, Rivard says the company’s new RIV 503 TR202 wide offset wheeled trencher is beneficial to any large scale power cable and pipe laying project, from water and gas pipe installation to power and fibre optic cable laying.
  • INTERMAT launch for Sokkia total stations
    January 6, 2017
    Sokkia’s CX total stations are said to represent a new industry standard for performance and security.
  • INTERMAT launch for Sokkia total stations
    February 3, 2012
    Sokkia’s CX total stations are said to represent a new industry standard for performance and security.
  • ATS has great screen presence
    March 27, 2013
    ATS’ polyurethane wire mesh screens for industrial screenings are said to offer a wide range of advantages including long service life; easy handling; less pegging and blinding; and high screening performance with perfect undersize calibration during the screen’s working lifetime. In addition, the firm says its wire mesh screens have less sound emanating from them, while reducing the weight of the vibrating screen is said to have improved its operation. The ATS screens are equipped with hooks and fitted in