Skip to main content

Sateco launches lift shaft podium

Sateco says its new lift shaft podium (PCA) makes it possible to block and secure access to lift shafts during building work. It also maximises secure work and material storage space during the time it takes to build up concrete shells. Due to its adjustable telescopic feet and the dimension markings every 10cm along its adjustment pipes, it can be perfectly adjusted between heights of 2.7m and 4m. Its wooden working platform can also be extended using sliding cross-pieces that require neither screws nor na
January 6, 2017 Read time: 2 mins
Sateco is unveiling its new lift shaft podium at Intermat 2012.
3202 Sateco says its new lift shaft podium (PCA) makes it possible to block and secure access to lift shafts during building work. It also maximises secure work and material storage space during the time it takes to build up concrete shells.

Due to its adjustable telescopic feet and the dimension markings every 10cm along its adjustment pipes, it can be perfectly adjusted between heights of 2.7m and 4m. Its wooden working platform can also be extended using sliding cross-pieces that require neither screws nor nails. The lift shaft podium can be extended from a square platform measuring 1.6m x 1.6m to a large format rectangular platform measuring 2.5m x 2.6m, in steps of 1cm length and 5cm width.

Fully foldable and collapsible, making it easy to transport, the podium is delivered with foldable access ladder with integrated safety bow for fitting between floors.

%$Linker: External 0 0 0 oLinkExternal <span class="mouselink">www.sateco-coffrages.com</span> Sateco false http://www.sateco-coffrages.com/ false false%>

%$Linker: 2 Internal 2 4824 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/intermat-2012/video/ true false%>

For more information on companies in this article

Related Content

  • Peri launched UP MDS Formwork at INTERMAT 2012
    January 6, 2017
    Peri is unveiling its new UP MDS shoring tower to all markets outside France at INTERMAT 2012. The shoring tower is equipped with working platforms hanging from the handrails, providing a high level of security during the erection and dismantling phases, and a significantly reduced exposure to musculoskeletal disorders (MSDs). The working platform sets an automatic working position 1m below the handrail and follows the top of the tower. The system improves productivity by optimising weight (total weight of
  • Peri launched UP MDS Formwork at INTERMAT 2012
    February 3, 2012
    Peri is unveiling its new UP MDS shoring tower to all markets outside France at INTERMAT 2012. The shoring tower is equipped with working platforms hanging from the handrails, providing a high level of security during the erection and dismantling phases, and a significantly reduced exposure to musculoskeletal disorders (MSDs). The working platform sets an automatic working position 1m below the handrail and follows the top of the tower. The system improves productivity by optimising weight (total weight of
  • INTERMAT launch for Ammann’s ARX roller models
    January 6, 2017
    Ammann is launching an extended range of lightweight tandem rollers, badged the ARX models. The range includes 13 models from 1.5-4.5tonnes and working widths from 820–1380mm, to replace the AVM-2 range later this year.
  • INTERMAT launch for Ammann’s ARX roller models
    February 15, 2012
    Ammann is launching an extended range of lightweight tandem rollers, badged the ARX models. The range includes 13 models from 1.5-4.5tonnes and working widths from 820–1380mm, to replace the AVM-2 range later this year.