Skip to main content

SANY state-of-the-art R&D facility is nearer completion

The main structure has been completed at the SANY Global Construction Machinery R&D Development Center in Kunshan, China. The centre will be one of the largest single research and development facilities in the country when fully completed.
By Guy Woodford January 13, 2021 Read time: 1 min
The main structure has been completed at the SANY Global Construction Machinery R&D Development Center

Designed by world-famous architect Colin Franzen, the campus will cover a total area of 1.1 million sq ft. It will feature administration, laboratory and new R&D functions and accommodate more than 5,000 employees.

“Creatively, the single main building (centre of image) is naturally divided into three functional areas by its shape, which resembles the logo of the company…and we blur the boundary between workspace and landscape, which I believe is the most cutting-edge and imaginative architectural design for construction machinery companies in China,” said Franzen.

An artist’s impression of how SANY’s cutting-edge R&D center will look on completion
An artist’s impression of how SANY’s cutting-edge R&D center will look on completion

The landmark building will become a ‘nest’ for SANY’s future intellectual and advanced machinery prototypes. The R&D centre will integrate exploring, prototyping, testing, and showcasing SANY’s next-generation excavators.

As one of the company’s most important projects currently under construction, SANY says the Global Construction Machinery R&D Center will strengthen its corporate competitiveness by developing state-of-the-art technologies for construction and earthmoving machinery.

According to the project’s leader, Zhang Weifeng, the facility is expected to be completed by September 2021, creating a workspace that offers an “unprecedented and thrilling” experience.

For more information on companies in this article

Related Content

  • The ABG Advantage: What separates these pavers from the competition?
    September 25, 2024
    There are a great many roadbuilding products out there. Sometimes it can be hard to separate the best from the rest.
  • Norway’s new ‘green’ highway route
    November 13, 2020
    A new route in Norway will provide a faster and greener highway connection between the capital city Oslo and the northern city of Trondheim
  • Digital transformation with production system solutions from Wirtgen Group
    May 24, 2024

    Maximising a machine’s uptime, allocation of resources the most efficient way, completing projects on schedule and ensuring the quality of results are nowadays major factors that decide whether a company can run its business successfully or not. This is amplified by the fact that the labor-intensive construction sector is affected by a global shortage of skilled workforce like few other industries and has to meet far-reaching requirements for quality, documentation, and sustainability.

  • Nuphalt is well-prepared to meet the growing challenge for road repairs
    November 21, 2023

    2023 is proving to be a great year for the Nuphalt Group. Beginning in January with a move into their brand-new, purpose-built facility in Rugby, UK, utilising new mezzanine floors (increased manufacturing space by 50%), adding state-of-the-art laser cutting equipment and, of course, bringing everything under one roof. And with 100 kW of PV solar power up there, that’s no ordinary roof! The move to a more self-sufficient premises is all part of Nuphalt’s vision for a greener future.