Skip to main content

Sandvik Construction’s new Driller’s Office software

Sandvik Construction has unveiled what it says is a ground-breaking practical software tool for surface drilling process management called the Sandvik Driller’s Office.
March 6, 2014 Read time: 2 mins
2403 Sandvik Construction has unveiled what it says is a ground-breaking practical software tool for surface drilling process management called the Sandvik Driller’s Office.

“This is an advanced tool is for anyone who works with surface drilling management, in particular in quarrying applications,” said Sandvik. “It helps simplify the whole process, as well as managing it efficiently.”

Sandvik Driller’s Office software is a surface drilling planning and data management tool and covers drill Plan design, drilling data management and reporting, following the logic of the job site and featuring visualisations of the drilling pattern and 3D terrain models.

Sandvik Driller’s Office also features a Drill Plan Wizard for quick creation of basic drilling plans and a Drill Plan Editor for creating more advanced plans.

In Drill Plan Editor hole positions, floor level, inclination, direction and many more factors, can be adjusted independently as needed.

A measurement tool and specific markers define the correct spot to start drilling, meaning that separate measuring and marking is not needed at the site which saves time and money.

Communications to and from the rig is handled over a mobile data connection, and Sandvik Driller’s Office tool is available for all TIM3D-ready surface drills.
www.construction.sandvik.com

For more information on companies in this article

Related Content

  • Topcon unveils web-based construction management tool
    April 17, 2013
    Topcon is introducing Enterprise3D, a subscription web-based construction and engineering management tool which aids complete job site planning and scheduling. Reports from and to the system can be sent via Topcon’s sitelink3D.net web portal from anywhere in the world.
  • Sandvik DC125R is new member of DC hammer drill family
    January 6, 2017
    Sandvik DC125R is a new member to the proven Sandvik DC family of compact, rubber-tyred top hammer drill rigs. The fully remote-controlled, hydraulic and self-propelled mini-sized drilling unit on a four-wheel drive carrier, is for drilling 22–45mm holes, and replaces the former Sandvik DC122R, one in the series of rigs originally launched in 1988 under the product name of Tamrock Commando. “A range of job site tests show that the new model offers better manoeuvrability than ever before. This is thanks to t
  • Sandvik boosts crushing performance
    January 6, 2017
    Sandvik has unveiled the Premium QI441 PriSec Impactor mobile crusher and the QE341 mobile scalper, both of which have been designed with improved output, easier operation and increased mobility. The QI441 features Sandvik’s patented PriSec crushing chamber, which is designed for rapid switching between primary and secondary crushing applications. Two hydraulically adjusted curtains permit the production of a wide range of product sizes. Increased discharge heights and conveyor lengths deliver up to 50% mor
  • Construction software boosts operating efficiency
    March 5, 2012
    Intelligent data handling and management technologies are helping boost operating efficiency - Mike Woof reports The construction software sector and GIS market are seeing a rapid development of new products and technologies that will help boost efficiency, with factors such as data management and platform integration being key focus areas.