Skip to main content

Sandvik Construction’s new Driller’s Office software

Sandvik Construction has unveiled what it says is a ground-breaking practical software tool for surface drilling process management called the Sandvik Driller’s Office.
March 6, 2014 Read time: 2 mins
2403 Sandvik Construction has unveiled what it says is a ground-breaking practical software tool for surface drilling process management called the Sandvik Driller’s Office.

“This is an advanced tool is for anyone who works with surface drilling management, in particular in quarrying applications,” said Sandvik. “It helps simplify the whole process, as well as managing it efficiently.”

Sandvik Driller’s Office software is a surface drilling planning and data management tool and covers drill Plan design, drilling data management and reporting, following the logic of the job site and featuring visualisations of the drilling pattern and 3D terrain models.

Sandvik Driller’s Office also features a Drill Plan Wizard for quick creation of basic drilling plans and a Drill Plan Editor for creating more advanced plans.

In Drill Plan Editor hole positions, floor level, inclination, direction and many more factors, can be adjusted independently as needed.

A measurement tool and specific markers define the correct spot to start drilling, meaning that separate measuring and marking is not needed at the site which saves time and money.

Communications to and from the rig is handled over a mobile data connection, and Sandvik Driller’s Office tool is available for all TIM3D-ready surface drills.
www.construction.sandvik.com

For more information on companies in this article

Related Content

  • Sandvik Construction’s new CH550 cone crusher
    January 6, 2017
    Sandvik Construction says its new generation of compact cone crusher provides customers with optimum performance and good cubical shape, while ensuring low operating costs per tonne for a wide range of materials and applications. The all-new patented 18.9tonne Sandvik CH550, is based on the proven HYDROCONE design, with the CH550 combining the ability to produce excellent shaped products, in fewer crushing stages.”
  • Sandvik’s Turkish delight at groundbreaking tunnel vision
    May 20, 2014
    Turkey’s longest, and what will be the world’s fourth longest, highway tunnel is being built under Mount Ovit in the northeast of the country. Sandvik Construction is playing a vital role in the construction of the giant new structure, which will enable all-year-round access to what is a relatively remote and often snow-blocked part of Anatolia Having had their freedom of movement blighted for many years by wintertime snow blocking the D925 highway, along with narrower roads and passes, at Mount Ovit, resi
  • Bogie suspended rollers for CTL track frames
    January 6, 2017
    Track component supplier Berco has developed a track frame for larger capacity compact tracked loaders that uses a bogie system to suspend the bottom rollers. Initially targeting machines in the 4.3-5.2 tonne sector, with 84-100hp, the track frame has a five-roller design.
  • Bogie suspended rollers for CTL track frames
    March 11, 2014
    Track component supplier Berco has developed a track frame for larger capacity compact tracked loaders that uses a bogie system to suspend the bottom rollers. Initially targeting machines in the 4.3-5.2 tonne sector, with 84-100hp, the track frame has a five-roller design.