Skip to main content

Sandvik Construction’s new Driller’s Office software

Sandvik Construction has unveiled what it says is a ground-breaking practical software tool for surface drilling process management called the Sandvik Driller’s Office.
January 6, 2017 Read time: 2 mins
2403 Sandvik Construction has unveiled what it says is a ground-breaking practical software tool for surface drilling process management called the Sandvik Driller’s Office.

“This is an advanced tool is for anyone who works with surface drilling management, in particular in quarrying applications,” said Sandvik. “It helps simplify the whole process, as well as managing it efficiently.”

Sandvik Driller’s Office software is a surface drilling planning and data management tool and covers drill Plan design, drilling data management and reporting, following the logic of the job site and featuring visualisations of the drilling pattern and 3D terrain models.

Sandvik Driller’s Office also features a Drill Plan Wizard for quick creation of basic drilling plans and a Drill Plan Editor for creating more advanced plans.

In Drill Plan Editor hole positions, floor level, inclination, direction and many more factors, can be adjusted independently as needed.

A measurement tool and specific markers define the correct spot to start drilling, meaning that separate measuring and marking is not needed at the site which saves time and money.

Communications to and from the rig is handled over a mobile data connection, and Sandvik Driller’s Office tool is available for all TIM3D-ready surface drills.
www.construction.sandvik.com

For more information on companies in this article

Related Content

  • Debut for Godwin’s low-head Vac-Prime pump
    April 17, 2013
    Xylem company Godwin has launched the Vac-Prime low-head pump to complement its Dri-Prime medium- to high-head range. Xylem’s Godwin Vac-Prime has been specifically designed for lower-head dewatering applications. It can manage heads of 11m to 25m, flows of 100m3/hour to 374m3/hour and solids with sizes from 45mm to 75mm. The pump is available in 4” and 6” (101mm and 152mm) versions.
  • Bergkamp is offering an innovative pothole patcher
    January 6, 2017
    Bergkamp is introducing new spray injection pothole patcher tools at Conexpo. The firm says that its fully mobile material transfer and storage trailer can increase paving time and reduce costs, while also cutting the risks of trucks being stopped for being overweight. Truck-mounted micro surfacing pavers can connect to this new Mobile Stockpile and be refilled with aggregate and emulsion.
  • Bergkamp is offering an innovative pothole patcher
    January 24, 2014
    Bergkamp is introducing new spray injection pothole patcher tools at Conexpo. The firm says that its fully mobile material transfer and storage trailer can increase paving time and reduce costs, while also cutting the risks of trucks being stopped for being overweight. Truck-mounted micro surfacing pavers can connect to this new Mobile Stockpile and be refilled with aggregate and emulsion.
  • Sandvik on drill at the Liantang/Heung Yuen Wai Boundary project
    April 4, 2018
    The Liantang/Heung Yuen Wai Boundary Control Point project is creating a seventh land crossing, including highways and tunnels, between Shenzhen in China and Hong Kong There are already two control points on the eastern side of the New Territories between China and Hong Kong - at Man Kam To and Sha Tau Kok – to access eastern Shenzhen and Guangdong. All cross-boundary traffic travelling from these points must use busy local roads in Hong Kong and Shenzhen before joining the major highway systems. The US