Skip to main content

Sandvik Construction’s new Driller’s Office software

Sandvik Construction has unveiled what it says is a ground-breaking practical software tool for surface drilling process management called the Sandvik Driller’s Office.
January 6, 2017 Read time: 2 mins
2403 Sandvik Construction has unveiled what it says is a ground-breaking practical software tool for surface drilling process management called the Sandvik Driller’s Office.

“This is an advanced tool is for anyone who works with surface drilling management, in particular in quarrying applications,” said Sandvik. “It helps simplify the whole process, as well as managing it efficiently.”

Sandvik Driller’s Office software is a surface drilling planning and data management tool and covers drill Plan design, drilling data management and reporting, following the logic of the job site and featuring visualisations of the drilling pattern and 3D terrain models.

Sandvik Driller’s Office also features a Drill Plan Wizard for quick creation of basic drilling plans and a Drill Plan Editor for creating more advanced plans.

In Drill Plan Editor hole positions, floor level, inclination, direction and many more factors, can be adjusted independently as needed.

A measurement tool and specific markers define the correct spot to start drilling, meaning that separate measuring and marking is not needed at the site which saves time and money.

Communications to and from the rig is handled over a mobile data connection, and Sandvik Driller’s Office tool is available for all TIM3D-ready surface drills.
www.construction.sandvik.com

For more information on companies in this article

Related Content

  • JCB announces record profit in 67-year history
    January 6, 2017
    JCB has announced the best results in its 67-year history with earnings reaching a new record. While turnover for 2012 remained virtually unchanged at £2.7 billion, profit rose by £10m to £365m on an earnings before interest, taxes, depreciation, and amortisation (EBITDA) basis.
  • JCB announces record profit in 67-year history
    April 15, 2013
    JCB has announced the best results in its 67-year history with earnings reaching a new record. While turnover for 2012 remained virtually unchanged at £2.7 billion, profit rose by £10m to £365m on an earnings before interest, taxes, depreciation, and amortisation (EBITDA) basis.
  • Lintec’s first Aggregates Cooling System sold to Dubai
    January 6, 2017
    A new, patented Aggregates Cooling System (ACS) was one of the main taking points on the stand of asphalt and concrete plant manufacturer Lintec at Conexpo. Lintec has just sold its first ever plant to concrete manufacturer Emirates Beton in Dubai. When mixing concrete in warm climates, aggregate has to be cooled in order to maintain the performance and quality of the finished product, explained Lintec managing director Carsten Weiss: “If you don’t cool it, you don’t get the strength at the end,” he said. “
  • Lintec’s first Aggregates Cooling System sold to Dubai
    March 11, 2014
    A new, patented Aggregates Cooling System (ACS) was one of the main taking points on the stand of asphalt and concrete plant manufacturer Lintec at Conexpo. Lintec has just sold its first ever plant to concrete manufacturer Emirates Beton in Dubai. When mixing concrete in warm climates, aggregate has to be cooled in order to maintain the performance and quality of the finished product, explained Lintec managing director Carsten Weiss: “If you don’t cool it, you don’t get the strength at the end,” he said. “