Skip to main content

Sandvik Construction’s all-new CH540 cone crusher is the face of the next generation

Sandvik Construction’s newly-developed CH540 cone crusher, the latest crusher in the series, was launched by the company at Conexpo 2014 this week. The all-new CH540, and the bigger CH550 (launched in 2013), are cone crushers that have endless combination possibilities, says Sandvik Construction, “being the perfect match for any aggregate plant or quarry looking to increase production capacity, eliminate bottlenecks, reduce operating costs, and/or to improve the quality of the end product.”
January 6, 2017 Read time: 2 mins
The all-new CH540 and CH550 cone crushers “have endless combinations”
2403 Sandvik Construction’s newly-developed CH540 cone crusher, the latest crusher in the series, was launched by the company at Conexpo 2014 this week.

The all-new CH540, and the bigger CH550 (launched in 2013), are cone crushers that have endless combination possibilities, says Sandvik Construction, “being the perfect match for any aggregate plant or quarry looking to increase production capacity, eliminate bottlenecks, reduce operating costs, and/or to improve the quality of the end product.”

The company says the wide performance range provides customers with adaptability and flexibility, with the crushers being able to be configured for either secondary or tertiary applications.

“Our customers need to produce high quality aggregates in a cost-efficient way,” said Martin Johansson, Sandvik Construction’s product line manager.

“In order to optimise their business our customers require as few, and as short maintenance interruptions as possible: this is now achieved by the CH500 series that gives them a versatile cone crusher which combines a small carbon footprint with high performance,” he added.

“Sandvik has developed the new CH500 crusher series based on valuable input from our customers. So as to increase performance, while reducing weight and height, we had to optimise all our components.”

The series is based on the proven HYDROCONE process, facilitating the production of a high quality end product with excellent cubicity.
www.construction.sandvik.com

For more information on companies in this article

Related Content

  • Swarco launches CubiLED – the modular VMS
    January 6, 2022
    Swarco's new variable message sign solution offers flexibility for highway agencies
  • Advances in mobile crushing delivers cost savings
    February 29, 2012
    New and improved mobile crushing and screening equipment is focused on delivering cost/tonne reductions in aggregate production - Geoff Ashcroft reports. The level of technology being applied to mobile crushing and screening systems continues to advance, which is indicative of manufacturer confidence in this sector as one that continues to offer an economic benefit. An example of how electronic technology can lead to greater productivity can be found with KPI-JCI - the firm has introduced a high resolution
  • Doka’s DokaTruss table and Super Climber SCP on show at Conexpo 2014
    January 6, 2017
    Doka is inviting Conexpo 2014 visitors to take a look into the future of formwork technology – with the Austrian firm’s DokaTruss table and Super Climber SCP on show. A modular forming machine optimised for highrise cores, Doka says the new and improved version of the proven Super Climber SCP has been “rigorously developed”. In combination with DokaTruss table, a system aimed for setting and stripping large slab formwork, high speed construction cycles can, says Doka, be achieved efficiently. In the Comp
  • Doka’s DokaTruss table and Super Climber SCP on show at Conexpo 2014
    January 17, 2014
    Doka is inviting Conexpo 2014 visitors to take a look into the future of formwork technology – with the Austrian firm’s DokaTruss table and Super Climber SCP on show. A modular forming machine optimised for highrise cores, Doka says the new and improved version of the proven Super Climber SCP has been “rigorously developed”. In combination with DokaTruss table, a system aimed for setting and stripping large slab formwork, high speed construction cycles can, says Doka, be achieved efficiently. In the Comp