Skip to main content

San Ignacio de Moxos-Trinidad road scheme in Bolivia to go ahead

Bolivian president Evo Morales said the 77.8km San Ignacio de Moxos-Trinidad road scheme would still go ahead – despite the temporary suspension of work on a contentious section of the route. President Morales’ assurance over the completion of the road, the final section of the highway link between Cochabamba-Beni, was given amid strong objections to the San Ignacio de Moxos-Villa Tunari stretch passing through the TIPNIS natural park.
November 23, 2012 Read time: 2 mins
Bolivian president Evo Morales said the 77.8km San Ignacio de Moxos-Trinidad road scheme would still go ahead – despite the temporary suspension of work on a contentious section of the route.

President Morales’ assurance over the completion of the road, the final section of the highway link between Cochabamba-Beni, was given amid strong objections to the San Ignacio de Moxos-Villa Tunari stretch passing through the TIPNIS natural park.

The San Ignacio de Moxos-Trinidad road scheme is currently in the State Contract System (Sicoe) and, under the terms of an international tender, a total of US$77.90 million has been guaranteed by the government to build the road, which must be completed within 54 months.

A total of 19 indigenous leaders along the road scheme’s route have approved the project, so a public consultation is not needed. To date, a total of 53 communities have approved a road via TIPNIS, with only three opposing. Nazaret Flores, a local leader, said he did not believe that indigenous communities had rejected the road scheme, but were against the part of the project that passes through the TIPNIS natural park.

Related Content

  • A variety of measures will increase demand for electric vehicles
    April 2, 2013
    A wide array of measures is being used around the world to encourage customers to buy electric vehicles. Customers are still proving reluctant in many markets to buy electric vehicles, with range concerns and purchase costs amongst the key. Nissan reports that sales of its sophisticated Leaf model (developed jointly with its partner Renault) have been sluggish in Europe, despite glowing reviews in various motoring magazines. In the UK one leading thinktank, the Institute for Public Policy Research (IPPR), h
  • Italy's strategic tunnel link
    August 21, 2012
    The world's largest tunnelling machine is completing Italy's important road connection between Bologna and Florence - Adrian Greeman reports For just under a decade a huge programme of highway construction has been underway in the mountainous region between Bologna and Florence, realigning a section of the A1 highway nearly 70km long. The new section, through major tunnels and across high viaducts, will greatly increase capacity on Italy's most important highway.
  • Protest storm over new US$0.5bn Nevada highway
    August 20, 2012
    The most expensive highway ever built in Nevada will open before the end of August to a storm of protest. The new 13.7km Interstate 580 three-lane motorway, which is reported to have cost more than US $0.5 billion to construct, has been dubbed a vanity project by local politicians.
  • Zipping up road lanes – with Barrier Systems
    September 10, 2018
    QMB has a Lindsay Road Zipper on duty near Montreal. World Highways deputy editor David Arminas climbed aboard As vice president of Canadian barrier specialist QMB, based in Laval, Quebec, Marc-Andre Seguin is sanguine about the future for moveable barriers. On the one hand, it looks good. The oft-stated advantage of moveable barriers is that the systems are cheaper to install than adding a lane or two to a highway or bridge. Directional changes to lanes can boost volume on a road without disrupting tra