Skip to main content

San Ignacio de Moxos-Trinidad road scheme in Bolivia to go ahead

Bolivian president Evo Morales said the 77.8km San Ignacio de Moxos-Trinidad road scheme would still go ahead – despite the temporary suspension of work on a contentious section of the route. President Morales’ assurance over the completion of the road, the final section of the highway link between Cochabamba-Beni, was given amid strong objections to the San Ignacio de Moxos-Villa Tunari stretch passing through the TIPNIS natural park.
November 23, 2012 Read time: 2 mins
Bolivian president Evo Morales said the 77.8km San Ignacio de Moxos-Trinidad road scheme would still go ahead – despite the temporary suspension of work on a contentious section of the route.

President Morales’ assurance over the completion of the road, the final section of the highway link between Cochabamba-Beni, was given amid strong objections to the San Ignacio de Moxos-Villa Tunari stretch passing through the TIPNIS natural park.

The San Ignacio de Moxos-Trinidad road scheme is currently in the State Contract System (Sicoe) and, under the terms of an international tender, a total of US$77.90 million has been guaranteed by the government to build the road, which must be completed within 54 months.

A total of 19 indigenous leaders along the road scheme’s route have approved the project, so a public consultation is not needed. To date, a total of 53 communities have approved a road via TIPNIS, with only three opposing. Nazaret Flores, a local leader, said he did not believe that indigenous communities had rejected the road scheme, but were against the part of the project that passes through the TIPNIS natural park.

Related Content

  • Durability is crucial while warm mix technology can help disaster recovery
    February 21, 2013
    Why durability is crucial for both emerging and developed economies, and how warm mix technology can help disaster recovery - Kristina Smith reports. When CORE Construction, a 100% owned Ghanaian company, started working on road construction projects five years ago, it was difficult to source the right bituminous mixes. “In the past, most construction firms had a number of challenges when it came to bituminous works, since the local capacity was not well-developed,” said CORE CEO Frank Lartey. CORE’s soluti
  • Clearview’s SolarLite road studs light for the long term on Guernsey
    May 10, 2019
    The number of drivers feeling safe travelling along two of Guernsey’s key roads has more than doubled following the installation of solar powered road studs. In response to driver concerns about navigating unlit, narrow coastal roads after dark, Clearview Intelligence’s SolarLite Active Road Studs were installed along the La Neuve Rue at Albecq and Route de la Lague/ Route de Rocquaine at Fort Grey. Traditional retro reflective studs are reliant upon a vehicle headlight beam to be seen up to 90m away.
  • CCMA reports on an industry transformed (Survival of the fittest)
    January 6, 2017
    China Construction Machinery Association (CCMA) secretary general Su Zimeng presented the organisation’s industry status and forecast at Bauma China today. Mr Su reported that the Chinese domestic construction machinery market has declined substantially, and is still declining: The slide in domestic demand has been continuous, and inventory is still high, although lower than it has been. There are signs of stabilisation, and there are still challenges ahead, but CCMA believes the situation also presents opp
  • CCMA reports on an industry transformed (Survival of the fittest)
    November 28, 2012
    China Construction Machinery Association (CCMA) secretary general Su Zimeng presented the organisation’s industry status and forecast at Bauma China today. Mr Su reported that the Chinese domestic construction machinery market has declined substantially, and is still declining: The slide in domestic demand has been continuous, and inventory is still high, although lower than it has been. There are signs of stabilisation, and there are still challenges ahead, but CCMA believes the situation also presents opp