Skip to main content

Russia’s US$28 billion road and bridge works

A series of major transport projects worth a combined value of over US$28 billion are set to significantly enhance connectivity between various parts of Russia. These include the Moscow-St Petersburg highway, work to the transport system in the Rostov region and two new bridges: one over the Belaya river in Ufa, the other over the Kama river in Izhevsk. The tender process for the $4.46 billion contract to build, maintain, repair, and operate a section of the Moscow- St Petersburg highway has been announc
November 29, 2013 Read time: 2 mins
More than US$28 billion is being invested in Russian road projects
A series of major transport projects worth a combined value of over US$28 billion are set to significantly enhance connectivity between various parts of Russia. These include the Moscow-St Petersburg highway, work to the transport system in the Rostov region and two new bridges: one over the Belaya river in Ufa, the other over the Kama river in Izhevsk. 

The tender process for the $4.46 billion contract to build, maintain, repair, and operate a section of the Moscow- St Petersburg highway has been announced by 3974 Avtodor. The section is from the 334th to the 543rd kilometre. Construction work will be carried out from 2014-2018. The contractor will maintain the road, toll collection system, and automated traffic control system for 22 years after construction finishes. The tender agreement will be signed in mid-December 2013.

Over $23.4 billion will be invested in the transport system of the Rostov region as part a transport system development strategy planned until 2030. The strategy will be carried out in three stages. The first phase will take place from 2013-2015, and will include: development of public-private partnership, road safety improvement, motor road chain expansion, and preparation for large-scale investment projects.

Elsewhere, Uralmostostroy has won the tender to build the Zatonsky bridge over the Belaya river in Ufa (Volga) for $143 million. A bridge spanning the Kama river is expected to cost US$438 million to construct. The contractor VTB is one of the firms that will be involved in the construction of the crossing. VTB is also looking to build a bridge spanning the Lena river as well as a section of the high speed highway that will link Russia’s major conurbations of Moscow and St Petersburg. This last contract looks likely to be awarded in the second quarter of 2014.

For more information on companies in this article

Related Content

  • New international trade crossing linking Canada and US
    June 9, 2015
    The Detroit River is short, only 45km, and narrow in places, less than 1km. Around a quarter of the annual $658 billion Canada-US trade crosses over the river. That’s $160 billion worth of goods trucked each year between Detroit in the US state of Michigan and the Canadian city of Windsor in the province of Ontario - the Windsor-Detroit Corridor. There are several types of crossings, but the vast majority of commercial traffic must use the 2.3km Ambassador Bridge (see box). A new bridge was initially prop
  • IDB, iRAP extend Latin America-Caribbean work
    February 25, 2025
    The five-year deal was signed during the Ten Steps to 2030 for Safer Road Infrastructure Side Event at the recent 4th Global Ministerial Conference on Road Safety underway in Marrakech, Morrocco.
  • 1st IRF Europe & Central Asia Regional Congress held on in Turkey
    November 18, 2015
    The International Road Federation (IRF) organised its first Regional Congress & Exhibition in Istanbul, Turkey on 15–18 September, 2015 The IRF is a non-governmental, not-for-profit membership organisation founded in Washington, DC in 1948 with the mission to encourage and promote development and maintenance of better, safer and more sustainable roads and road networks around the world.
  • Canada: work officially starts on Montreal’s Champlain Bridge
    June 25, 2015
    Canada’s infrastructure minister, Denis Label, officially broke ground for Montreal’s replacement Champlain Bridge, saying the project will likely cost US$3.42 billion. The 3.4km Champlain Bridge Corridor Project, including spans and highway expansions, is expected to be completed by 2019. SNC-Lavalin, the 50% stakeholder in the winning consortium Signature on the Saint-Lawrence, recently announced it had finalised the deal with new Champlain Bridge owner Infrastructure Canada. Signature on the Saint-