Skip to main content

Russian road deals

The new eastern bypass for Khabarovsk in Russia is being discussed by the local authorities. The 30km highway will feature four lanes and will connect the Chita–Khabarovsk (M-58) and Khabarovsk–Vladivostok (M-60) highways. It will also link with roads in the city at nine interchanges. The highway will have a speed limit of 140km/h. The project will be run on a public–private partnership basis and will cost US$540million. The government will provide 20–25% of the finances required, with the rest coming from
June 25, 2012 Read time: 2 mins
The new eastern bypass for Khabarovsk in Russia is being discussed by the local authorities. The 30km highway will feature four lanes and will connect the Chita–Khabarovsk (M-58) and Khabarovsk–Vladivostok (M-60) highways. It will also link with roads in the city at nine interchanges. The highway will have a speed limit of 140km/h. The project will be run on a public–private partnership basis and will cost US$540million. The government will provide 20–25% of the finances required, with the rest coming from private sources. A number of firms have already shown an interest in the project. The toll road will be operated under a concession basis. And a feasibility study is underway for the second bridge across the Ob River construction in Russia’s Surgut region. The 1.56km bridge will take 5–6 years to construct and will cost over $1 billion to build. The first bridge over the Ob River was built in 2000. Average daily traffic already exceeds its planned volume, which is why the second crossing is required.

Related Content

  • Road user charging to pay for road improvements?
    February 20, 2012
    What is the current situation with Russian roads? It is an objective answer to this question that is contained in the official report of the Federal State Statistics Service for 2009. Here it states: "...public roads are of poor quality: 8.4% of roads accounted for groundwater, nearly a third of roads are gravel, rubble or cobblestone.
  • Russia’s new high speed highway – with Italian investment
    January 30, 2020
    Italian investment will help to build a major high-speed highway in Russia
  • Russia highway project awarded
    November 16, 2017
    Contractor Sibmost is to handle construction work for the Khabarovsk Bypass project. The new road will provide a link between the A-370 Ussuri, R-297 Amur and A-375 Vostok highways. With the construction of the Amur River bridge crossing also in hand, the new link will help provide improved transport between Russia and China. Discussions over the Amur River crossing between Russia and China first commenced in the 1980s and the project has finally come to fruition. The new tolled highway stretch being built
  • Funding for key Russian highway projects
    May 10, 2012
    A notable partnership deal looks set to provide funding for key Russian highway projects. A memorandum of cooperation has been signed between the state-owned Russian Highways (Avtodor) and the European Bank for Reconstruction and Development (EBRD). Under this deal the EBRD may provide loans to Avtodor, redeem bonds, or co-operate on concession agreements. This funding stream will allow Avtodor to implement its key PPP projects. Avtodor and the EBRD have been discussing the highway linking Moscow with St Pe