Skip to main content

Russia plans major road upgrades

Plans are in hand for major upgrades to Russia’s road network. Russian Highways (Avtodor) aims to construct 958km of roads, as well as to reconstruct 963km of road and improve 700km of road bed by 2019. The 684km M11 highway linking Moscow with St Petersburg is the top-priority. A 72km bypass road will be built in the Tver region. In total, Avtodor says it will invest US$45.3 billion in building tolled roads in Russia by 2019. Avtodor completed work on the 25km M-4 highway in December 2011. Meanwhile a tend
March 22, 2012 Read time: 2 mins
Plans are in hand for major upgrades to Russia’s road network. Russian Highways (3974 Avtodor) aims to construct 958km of roads, as well as to reconstruct 963km of road and improve 700km of road bed by 2019. The 684km M11 highway linking Moscow with St Petersburg is the top-priority. A 72km bypass road will be built in the Tver region. In total, Avtodor says it will invest US$45.3 billion in building tolled roads in Russia by 2019. Avtodor completed work on the 25km M-4 highway in December 2011. Meanwhile a tender is being opened by the Moscow Capital Construction Department for a road in the South of the city from Podolskikh Kursantov Street to Moscow Ring Road. The Russian Government will invest $1.94 billion in the Novosibirsk Eastern Bypass. Construction will commence in 2012 and will be carried out in three stages.

For more information on companies in this article

Related Content

  • Rotenberg’s Mostotrest to fight for $5 billion Russia’s road-building contract
    December 2, 2013
    Interest is strong in one of Russia’s premier projects for road infrastructure - Eugene Gerden reports The State Company Russian Highways (Avtodor) has officially announced a tender for the construction of the sixth - and longest - section of the Moscow - St Petersburg highway. Avtodor is Russia’s leading company in the field of development of national road infrastructure, while this is one of the largest and most controversial projects in Russian road building in recent years. The 6th section of the
  • AVTODOR seeks another Moscow-St Petersburg motorway section bid
    December 18, 2014
    Russia's state highways agency AVTODOR has invited bids for construction of another section of the Moscow to St. Petersburg toll motorway. Starting cost of the bid to build the section from kilometre 58-149 is nearly US$1.2 billion. Investors will have to put up front 20% of the accepted bid cost to build the 91km section. Construction of the 700km motorway is being let in sections, with highly competitive bids coming from the major international players in highways infrastructure. In February 2014
  • Funding for key Russian highway projects
    May 10, 2012
    A notable partnership deal looks set to provide funding for key Russian highway projects. A memorandum of cooperation has been signed between the state-owned Russian Highways (Avtodor) and the European Bank for Reconstruction and Development (EBRD). Under this deal the EBRD may provide loans to Avtodor, redeem bonds, or co-operate on concession agreements. This funding stream will allow Avtodor to implement its key PPP projects. Avtodor and the EBRD have been discussing the highway linking Moscow with St Pe
  • Major road plans are being set for Russia’s two key cities
    May 14, 2012
    Targets are being set for road investment, construction and repairs in Russia. To meet the country’s infrastructure needs, Russia’s National Association of Builders estimates that some 1,500km of roads must be built/year. Meanwhile the highway authorities in Moscow are aiming to repair around 33% of the city’s road surface every year. Some 23.6 million m2 of road surface will be repaired in Moscow during 2012, compared with 24.7 million m2 in 2011.