Skip to main content

Rural road programme for China

A programme of rural road improvements will see the upgrade of 100,000km of links in China's Sichuan Province.
February 17, 2012 Read time: 1 min
A programme of rural road improvements will see the upgrade of 100,000km of links in China's Sichuan Province. The work is expected to cost US$2.4 billion. The programme of works forms part of the 12th five-year plan, set out for the 2011-2015 period. The upgrades will result in some 75% of the rural roads featuring asphalt surfaces. In 2011, the plan calls for the upgrade of 20,000km of rural roads in the province.

Related Content

  • KGM to build 2,000km of new roads in Turkey
    April 26, 2013
    The Turkish General Directorate of Motorways (KGM) aims to build over 2,000km of roads in 2013. They will consist of 998km single-platform roads and 1070.5km of dual carriageway. Out of the total duel carriageway, 20.5km will be added to motorways and 1,050km to state roads. Almost 20,000km roads will be asphalt covered or repaired. KGM currently manages 63,250km state roads and 2,250km of motorways in Turkey. It plans to build a total of 9,700km dual carriageway and 5,550km motorways by 2023.
  • New factory for excavator components
    April 5, 2012
    Caterpillar plans to open a new manufacturing facility in Xuzhou, Jiangsu Province, China, to produce undercarriage components and track assemblies, which are utilised on Cat hydraulic excavators.
  • New factory for excavator components
    February 22, 2012
    Caterpillar plans to open a new manufacturing facility in Xuzhou, Jiangsu Province, China, to produce undercarriage components and track assemblies, which are utilised on Cat hydraulic excavators.
  • New Algerian routes
    November 27, 2012
    A major new expressway will link Tizi-Ouzou in Algeria to the country’s East-West highway. The local authorities have been given a budget of US$623 million for the project. The expressway will connect to the East-West highway at Bouira. The project forms part of the 2010-14 five year plan and is required as the existing route linking Tizi-Ouzou to the East-West highway, the TN 12, is now carrying more vehicles than it was designed for. Meanwhile a feasibility study has been completed for a new six-lane high