Skip to main content

Royal Haskoning DHV’s Saudi bottleneck busting contract

Royal Haskoning DHV has been selected to tackle 30 major traffic bottlenecks in the Saudi Arabian capital Riyadh over the next two years. ArRiyadh Development Authority (ADA) decided to award the US$1.87million (€1.5mn) contract to the Dutch project management, engineering and consultancy service provider following a call for tenders. The population of Riyadh has risen dramatically over the past few decades and currently stands at around 5.4 million and, as a result, the city's roads and motorways are reach
July 9, 2012 Read time: 2 mins
Royal Haskoning DHV will be tackling 30 major traffic bottlenecks across Riyadh, Saudi Arabia.
Royal Haskoning DHV has been selected to tackle 30 major traffic bottlenecks in the Saudi Arabian capital Riyadh over the next two years.

ArRiyadh Development Authority (ADA) decided to award the US$1.87million (€1.5mn) contract to the Dutch project management, engineering and consultancy service provider following a call for tenders.

The population of Riyadh has risen dramatically over the past few decades and currently stands at around 5.4 million and, as a result, the city's roads and motorways are reaching the limits of their capacity, with traffic jams frequent on many highways.

"Petrol costs just nine euro cents per litre in Saudi Arabia, and you can buy a new car for a fraction of its price in the Netherlands," said Riyadh project director Joep Coopmans.

"Almost everyone travels by car to the city centre, and people are used to parking virtually everywhere. Despite its large scale, the existing road network is unable to cope with the massive growth in car traffic. It is therefore imperative to devise solutions which help reduce travel times without major changes to the existing infrastructure.”

In consultation with the city's traffic police, Royal Haskoning DHV (RH DHV) will map the existing traffic flows based on an extensive monitoring program. The firm will then identify the main bottlenecks together with various stakeholders. Problems which can be quickly resolved will be tackled immediately, while the RH DHV will work out two or three possible solutions for more complex bottlenecks.

The project will involve collaboration between experts from various disciplines, including traffic engineers, traffic safety experts, road designers, and experts in Intelligent Transportation Systems (ITS).

"We previously worked on two road development projects in Riyadh, and on traffic management projects in Sofia, Beijing and other cities,” said Coopmans. “This extensive experience, combined with our long-standing relationship with ADA, has given the client confidence in our ability to tackle traffic problems.”

Related Content

  • Moscow to invest $20 billion in massive road-building by 2015
    March 28, 2014
    A huge investment in road building will expand Moscow’s network – Eugene Gerden reports The government of Moscow plans to invest more than RUB 640 billion (US$20 billion) during the period of 2014-2015 .in a massive investment of road building in the city. This is expected to be part of Moscow city’s Master Plan, which is designed until 2025. Building of new roads is crucial for Moscow and should help the city to solve the problem of traffic jams. Despite all the efforts made by the city’s authorities in re
  • China's economic growth fuelling vehicle increase
    February 21, 2012
    China is at a turning point in many ways. The country's continuing economic growth is fuelling a massive increase in vehicle numbers, with no signs of slackening. This is most acute and most visible in major cities such as Beijing and Shanghai, where traffic jams are now a frequent occurrence
  • China's economic growth fuelling vehicle increase
    March 14, 2012
    China is at a turning point in many ways. The country's continuing economic growth is fuelling a massive increase in vehicle numbers, with no signs of slackening. This is most acute and most visible in major cities such as Beijing and Shanghai, where traffic jams are now a frequent occurrence. One recent Beijing tailback stretched nearly 100km along a major highway and was caused by roadworks at a particularly busy stretch of the road.
  • Saudi strategy
    February 6, 2012
    The contractors Arabian Electrical Equipment Company and Mohamad Al-Ali Al-Suwailem Company are to build a combined road and power substation project in Saudi Arabia's Al-Kharj Industrial City.