Skip to main content

Royal Haskoning DHV’s Saudi bottleneck busting contract

Royal Haskoning DHV has been selected to tackle 30 major traffic bottlenecks in the Saudi Arabian capital Riyadh over the next two years. ArRiyadh Development Authority (ADA) decided to award the US$1.87million (€1.5mn) contract to the Dutch project management, engineering and consultancy service provider following a call for tenders. The population of Riyadh has risen dramatically over the past few decades and currently stands at around 5.4 million and, as a result, the city's roads and motorways are reach
August 13, 2012 Read time: 2 mins
Royal Haskoning DHV will be tackling 30 major traffic bottlenecks across Riyadh, Saudi Arabia.

Royal Haskoning DHV has been selected to tackle 30 major traffic bottlenecks in the Saudi Arabian capital Riyadh over the next two years.

ArRiyadh Development Authority (ADA) decided to award the US$1.87million (€1.5mn) contract to the Dutch project management, engineering and consultancy service provider following a call for tenders.

The population of Riyadh has risen dramatically over the past few decades and currently stands at around 5.4 million and, as a result, the city's roads and motorways are reaching the limits of their capacity, with traffic jams frequent on many highways.

"Petrol costs just nine euro cents per litre in Saudi Arabia, and you can buy a new car for a fraction of its price in the Netherlands," said Riyadh project director Joep Coopmans.

"Almost everyone travels by car to the city centre, and people are used to parking virtually everywhere. Despite its large scale, the existing road network is unable to cope with the massive growth in car traffic. It is therefore imperative to devise solutions which help reduce travel times without major changes to the existing infrastructure.”

In consultation with the city's traffic police, Royal Haskoning DHV (RH DHV) will map the existing traffic flows based on an extensive monitoring program. The firm will then identify the main bottlenecks together with various stakeholders. Problems which can be quickly resolved will be tackled immediately, while the RH DHV will work out two or three possible solutions for more complex bottlenecks.

The project will involve collaboration between experts from various disciplines, including traffic engineers, traffic safety experts, road designers, and experts in Intelligent Transportation Systems (ITS).

"We previously worked on two road development projects in Riyadh, and on traffic management projects in Sofia, Beijing and other cities,” said Coopmans. “This extensive experience, combined with our long-standing relationship with ADA, has given the client confidence in our ability to tackle traffic problems.”

Related Content

  • Saudi Arabia crane deal
    February 13, 2017
    Kanoo Machinery (Kanoo), Manitowoc’s long-standing distribution partner in the Middle East, has been awarded the Manitowoc Cranes Elite Dealer status for its Saudi Arabian operations. The firm’s facility in Saudi Arabia is one of only four dealerships to receive this designation in the Middle East. The Elite Dealer award recognises dealers that excel in their parts and services standards, raising those standards at an international level. Many factors contributed to Kanoo winning the award, in particula
  • Road user charging, the way to highway investment?
    February 27, 2012
    Tough political decisions have to be made to ensure highway investment - *Dr Max Lay reports
  • Road user charging, the way to highway investment?
    April 12, 2012
    Tough political decisions have to be made to ensure highway investment - *Dr Max Lay reports Our road systems and how we use them have changed dramatically over the last few centuries, and yet some problems persist and others reappear. For most of human history roads have been used by foot traffic and by cumbersome wagons hauled at walking pace. Roads were built to provide some obvious advantage in commerce or conquest. They were then grudgingly maintained by those who might gain some advantage from the
  • Busy bridge in Beijing replaced quickly
    March 31, 2016
    The replacement of a very busy road bridge in China’s capital Beijing has been carried out successfully. Due to the volume of traffic using the bridge during week days, the work had to be carried out quickly so as to minimise traffic disruption. But despite being carried out in the centre of Beijing, the replacement work for the Sanyuan Bridge just took 43 hours from start to completion.