Skip to main content

Romanian roads for STRABAG

Austrian contractor STRABAG will build a 24km stretch of highway in Romania in a deal worth €166 million.
February 28, 2012 Read time: 1 min
Austrian contractor 945 Strabag will build a 24km stretch of highway in Romania in a deal worth €166 million. The highway will feature two lanes of traffic in either direction as well as hard shoulders and will take 22 months to complete.

The deal is the follow-up lot to the highway section STRABAG is building between Deva and Orãºtie. This earlier package was awarded in November 2010. The highway running from Orãºtie and Sibiu forms part of the Pan-European Corridor 4 from the Romanian-Hungarian border at Nãdlac and running through capital Bucharest to Constanta on the Black Sea.

The order is being financed 85 % by European funds (European Funds POS-T) and by funds from the Romanian national budget. The client for the work is the Compania Nationala de Autostrazi si Drumuri Nationale din Romania. The deal is the latest in a series of orders STRABAG has won in Romania. The company generated over 60 % of its output volume in transportation infrastructures in Romania during 2010. Besides the A1, the firm is also working on national roads DN 14 and 15a, DN 19 and DN 67B with an order value of some €450 million.

For more information on companies in this article

Related Content

  • Romania’s Cosmeşti Bridge work underway
    April 21, 2022
    The existing Cosmeşti Bridge, which opened in 1924, is a combined road and rail structure.
  • Moldova gets EBRD loan for M1, M2 upgrades
    August 28, 2023
    The work will enhance transport connectivity by strengthening core transport links with a focus on the pan-European TEN-T network.
  • Concrete connections for Tanzania
    March 16, 2012
    Austrian contractor STRABAG is now commencing construction work on a new bus transport system in Tanzania. The €134 million contract will improve connections in capital Dar es Salaam. The new Bus Rapid Transit Infrastructure project will see upgrades to three major routes in the city. The deal is being split into two. One comprises upgrading the road from Magomeni to Kimara, including 15 bus stops, the Kimara terminal and the terminal Ubongo. The second is for upgrades to the route after Magomeni Kivukoni t
  • Astaldi wins contract for part of Romania’s Brasov–Oradea motorway
    April 19, 2016
    Italian contractor Astaldi, as part of a joint venture, has won a €100 million contract to build of motorway in Romania. The contract is 18km of the Brasov–Oradea section of the partially built A3 Autostrade, a 584km route that runs north to south, from the border with Hungary to the capital Bucharest. Astalsi’s design and construction work includes three viaducts, five overpasses, three flyovers, and one motorway interchange. Work will begin in May and last for 16 months. Work on the Brasov-Oradea