Skip to main content

Romanian roads for STRABAG

Austrian contractor STRABAG will build a 24km stretch of highway in Romania in a deal worth €166 million.
February 28, 2012 Read time: 1 min
Austrian contractor 945 Strabag will build a 24km stretch of highway in Romania in a deal worth €166 million. The highway will feature two lanes of traffic in either direction as well as hard shoulders and will take 22 months to complete.

The deal is the follow-up lot to the highway section STRABAG is building between Deva and Orãºtie. This earlier package was awarded in November 2010. The highway running from Orãºtie and Sibiu forms part of the Pan-European Corridor 4 from the Romanian-Hungarian border at Nãdlac and running through capital Bucharest to Constanta on the Black Sea.

The order is being financed 85 % by European funds (European Funds POS-T) and by funds from the Romanian national budget. The client for the work is the Compania Nationala de Autostrazi si Drumuri Nationale din Romania. The deal is the latest in a series of orders STRABAG has won in Romania. The company generated over 60 % of its output volume in transportation infrastructures in Romania during 2010. Besides the A1, the firm is also working on national roads DN 14 and 15a, DN 19 and DN 67B with an order value of some €450 million.

For more information on companies in this article

Related Content

  • Romanian bridge project well underway
    June 8, 2022
    Romania’s Braila Bridge project is well underway.
  • Romania road works
    August 18, 2021
    Romanian road works are underway.
  • Strabag wins German A3 Autobahn contract
    July 24, 2015
    Austrian contract STRABAG has won the tender process to widen the A3 Autobahn in southern Germany. The contract will see the firm widening the A3 to six lanes in a deal worth €90 million. The A3 connects the cities of Frankfurt and Nuremburg. STRABAG has been awarded the EO 287 contract to widen a 5.7km section of the road using asphalt construction methods in the state of Bavaria. It has also won the EO 259 contract to widen an 8.5km section of road using asphalt construction methods in the state of in Bad
  • Contractor Strabag reports strong performance
    April 30, 2013
    Austrian contractor STRABAG reports healthy earnings before interest and taxes (EBIT) of €207 million in 2012. This figure beats the firm’s own expectations and the expectations of the market. Net income after minorities stood at €61 million, showing an expected considerable decrease of 66.67% compared to the year before. “An output volume of €14 billion in 2012 – that’s nothing to complain about. With €13.2 billion, the end-of-the-year order backlog is also nearly exactly at the pre-crisis level of 2008, s