Skip to main content

Romanian roads for STRABAG

Austrian contractor STRABAG will build a 24km stretch of highway in Romania in a deal worth €166 million.
February 28, 2012 Read time: 1 min
Austrian contractor 945 Strabag will build a 24km stretch of highway in Romania in a deal worth €166 million. The highway will feature two lanes of traffic in either direction as well as hard shoulders and will take 22 months to complete.

The deal is the follow-up lot to the highway section STRABAG is building between Deva and Orãºtie. This earlier package was awarded in November 2010. The highway running from Orãºtie and Sibiu forms part of the Pan-European Corridor 4 from the Romanian-Hungarian border at Nãdlac and running through capital Bucharest to Constanta on the Black Sea.

The order is being financed 85 % by European funds (European Funds POS-T) and by funds from the Romanian national budget. The client for the work is the Compania Nationala de Autostrazi si Drumuri Nationale din Romania. The deal is the latest in a series of orders STRABAG has won in Romania. The company generated over 60 % of its output volume in transportation infrastructures in Romania during 2010. Besides the A1, the firm is also working on national roads DN 14 and 15a, DN 19 and DN 67B with an order value of some €450 million.

For more information on companies in this article

Related Content

  • Czech highway deal for consortium partners
    February 5, 2019
    A consortium has won a package of works to construct a section of the D35 highway in the Czech Republic. The 12.6km stretch of the D35 highway lies between Opatovice and Časy and the project has a contract value of €132 million, with the work expected to take 44 months to complete. The consortium is headed by Austrian contractor STRABAG with a 41% stake in the deal and also includes the Czech firms Silnice and SMP CZ. This new four-lane link will feature two interchanges. The D35 is part of the northern
  • Astaldi wins Polish S7 contract between Naprawa and Skomielna Biala
    March 3, 2016
    Astaldi, a global construction company based in Rome, has won a contract worth nearly €222 million for construction of Poland’s S7 dual carriageway between Naprawa and Skomielna Biala. The contract, awarded by the Polish General Directorate for National Roads and Motorways (GDDKiA), includes construction of a 2km tunnel under the Lubon Maly massif, 38 bridges and viaducts and three motorway services. There will also be 25km of access roads and two junctions. The north-south S7, when completed, will ru
  • Serbia reduces cost of highway construction
    March 22, 2012
    Serbia has managed to reduce the cost of building the Corridor 10 highway by €80 million. These funds will instead be used to pay for upgrades and improvements needed for the second section of the highway project, close to Neradovci. So far some 180km of the Corridor 10 highway has been built over a 40 month time frame. A further 150km of the highway has still to be built. Work on the Corridor 10 motorway is also being financed by the European Bank for Reconstruction and Development and the state budget.
  • Romanian road bids to be submitted
    May 6, 2022
    Bids are to be submitted for a Romanian road project.